<br />Note
<br />P.O. Box 703 Date 3/12/2020
<br />J ! I Petaluma, CA. 94953 Project Name Redwood City Pavement Preservation Project
<br />707-765-2871 Phone Project No.
<br />' 1 707-765-2773 Fax Location: Redwood City, CA
<br />ramv(21)aysiciessi.com Estimator: RamyMughannam
<br />C-32.27Lk#883985. DIR rr 1000001757, Oandin a rate C) 2.0%. Under $5 Malian In Gross sales Quotation
<br />Item
<br />Description
<br />UOM
<br />Quantity
<br />Price Per
<br />Total
<br />1
<br />Traffic Control (our portion only)
<br />LS
<br />1
<br />$
<br />7,500.00
<br />$
<br />7,500.00
<br />2
<br />Remove Existing Striping (after dig out work)**
<br />LS
<br />1
<br />$
<br />24,838.00
<br />$
<br />24,838.00
<br />14
<br />12" White
<br />LF
<br />1598
<br />$
<br />4.00
<br />$
<br />6,392.00
<br />15
<br />24" White
<br />LF
<br />678
<br />$
<br />8.00
<br />$
<br />5,424.00
<br />16
<br />Pavement Markings
<br />SF
<br />2635
<br />$
<br />4.00
<br />$
<br />10,540.00
<br />17
<br />Detail
<br />LF
<br />7909
<br />$
<br />0.75
<br />$
<br />5,931.75
<br />18
<br />Detail 27b/39
<br />LF
<br />6082
<br />$
<br />1.25
<br />$
<br />7,602.50
<br />19
<br />Detail 38
<br />LF
<br />1955
<br />$
<br />2.00
<br />$
<br />3,910.00
<br />20
<br />Detail 38A
<br />LF
<br />1275
<br />$
<br />2.00
<br />$
<br />2,550.00
<br />21
<br />Green Bike Lane & Dashed Green Bike Lane
<br />SF
<br />4000
<br />$
<br />12.00
<br />$
<br />48,000.00
<br />22
<br />Blue RPM
<br />EA
<br />20
<br />$
<br />10.00
<br />$
<br />200.00
<br />**Item can be removed from contract
<br />This Proposal is per plans & specs., including Addendum 1, 2, 3, 4
<br />Tota 1
<br />122,888.25
<br />We are Signatory to Laborers Union
<br />Twentv 120J WORKING do vs min lrnvin notice needed with each nave -In. Schedule will fie mutually aareed uaon based on our exlsfin a scheduled
<br />work bocking. 'there are n rluarantees that we'll be able to meet GC's schedule. Preliminary schedule Is mandatory prior to contract execution.
<br />BSSI WILL NOT BE CHARGED _Llguidated Damon es due to_scheduling Issues or time_aver-run that were not caused by BSSI, especially when
<br />Schedule is not aareed upon. if BSSI is scheduled for the final counted work day, B551 will not be liable if for some unforeseen reason the
<br />single day prole ct becomes two. if aur scheduled move -!n is cancelled due to weat)ter, we will only return on otirrnext avalloble opeaIna.
<br />B.SS1 will not be responsible for LD's due to weather re-schedulincg. T
<br />Note: This proposal will be valid for 30 Do vs & be All-inclusive unless aareed upon prior to bid time. 8551 RESERVES THE RIGHT
<br />TO WITHDRAW PROPOSAL IF WRITTEN ACCEPTANCE IS NOT RECEIVED W1 THIN THE TiME ALLOWED (30 DAYS). NO E3f_CEPTIONSI
<br />Payment for Work Performed shall be made within 40 Days, or it will constitute our legal right to cease all operations until Paid. T
<br />Above proposal Includes Traffic Control for our portion.
<br />Work areas with -in project striping limits, are to be clean, clear & have unobstructed access for BSSI work.
<br />Exclusions: Permits, Surveying, Fees, Bonds, Asphalt Patching, Heavy Cleaninrr/PressuLe Wnshlnrg/Dirt Removal Ralf Ing, Crark Seulln�
<br />TCP, Traffic Police, Herbicide, SWPPP/WPCP, Removal of Hazardous Material, Temp. Striping after Slurry Seal, Parking signage, OCIP/WRAP
<br />Fees, Primary liability Ins. Greater than $2,000,000, Railroad or Hoz. insurance, Post Sweeping, Posting, CMS, Construction Area Signage
<br />Notifying, Removal of concrete curing materialprior to Thermoplastic/Paint/Marking installation, Sealing of surface after striping removal,
<br />grindings & spoils from Jobslte, Temp. striping, Mast -Arm Signage, Illuminated signage, removal of temp. striping (tape/floppies) that do not
<br />conflict with permanent striping (in the way), LCP.
<br />Proposal is based Two rnove-in(s). Additional move -Ins will be Billed at $3,500.00 each. Redirc(nq moue -ins does n a t change pricing.
<br />Any alteration or deviations from the above specifications Involving extra cost will be executed only upon written orders, & will be an extra charge
<br />Prime Co) itractor to provide d1wasalarea. Location for disposal bin durina rem ovat operation and testIna.
<br />Quotation (including Incluslons & Exclusions) MUST become part of any contract or purchase order, and cannot be superseded by any other terms of the aareement
<br />Verbal or Flectronic Agreement to prlrlrnabove,_ binds Contractor or owner t4 terms _& conditions oIM QaQle.