Laserfiche WebLink
ADD ALTERNATE BID SCHEDULE <br />ADD ALTERNATE <br />BID ITEMS <br />Item <br />Unit Price <br />Total Item <br />Cost <br />Description <br />Estimated <br />Quantity <br />Unit <br />Mobilization, Demobilization, Traffic <br />Control, Construction Layout, <br />19. <br />Notification & Incidentals (Maximum <br />1 <br />LS <br />$ <br />$ <br />5% of the Total Base Bid, Items 19 <br />through 24) <br />5,000,00 <br />5,000.00 1 <br />Sheeting, shoring and bracing for all <br />20 <br />trenching and excavation work in <br />1 <br />LS <br />$ <br />$ <br />accordance with California Labor <br />Code Section 6707 <br />8" diameter PVC SDR 26 pipe <br />5,000.00 <br />5,000.00 <br />21. <br />384 <br />LF <br />$ 250.00 <br />$ 96,000.00 <br />22 <br />Replace existing Sanitary Sewer <br />3 <br />EA <br />$ <br />$ <br />Manhole <br />6,000.00 <br />18,000.00 <br />23 <br />Remove and dispose existing <br />3 <br />EA <br />$ <br />$ <br />Sanitary Sewer Manhole <br />700.00 <br />2,100.00 <br />4" diameter Sanitary Sewer Lateral <br />24. <br />and cleanout to new Sanitary Sewer <br />1 <br />EA <br />$ <br />$ <br />Line <br />1,500.00 <br />1, 500.00 <br />6" diameter Sanitary Sewer Lateral <br />25. <br />and cleanout to new Sanitary Sewer <br />12 <br />EA <br />$ <br />$ <br />Line <br />ADD ALTERNATE BID ITEMS <br />(ITEMS 19 <br />THROUGH <br />1,800.00 <br />21,600.00 <br />TOTAL <br />25) <br />149,200.00 <br />SUMMARY OF BID TOTALS <br />TOTAL BASE BID: 2,696,350.00 <br />TOTAL ADD ALTERNATE BID: 149,200.00 <br />TOTAL BID (BASE BID + ADD ALTERNATE BID ITEMS): 2,845,550.00 <br />Note: Determination of the lowest bid will be based upon the TOTAL BID (BASE BID + ADD <br />ALTERNATE BID ITEMS <br />BID FORM 004113-4 <br />2020-2021 SANITARY SEWER REPLACEMENT PROJECT <br />