Laserfiche WebLink
SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and additive bid alternate (if any), must be filled in <br />completely. Bid items are described in Section 01 1100 (Summary of Work). Quote in figures <br />only unless words are specifically requested. <br />BASE BID SCHEDULE <br />BASE BID ITEMS <br />Item <br />Description <br />Mobilization, Demobilization, Traffic <br />Control, Construction Layout, <br />1. <br />Notification & Incidentals (Maximum 5% <br />of the Total Base Bid, Items 1 <br />through 18) <br />Sheeting, shoring and bracing for all <br />2' <br />trenching and excavation work in <br />accordance with California Labor Code <br />Section 6707 <br />3. <br />8" diameter PVC SDR 26 pipe <br />30" diameter steel pipe casing by bore <br />and jack method and new 18" diameter <br />4. <br />PVC SDR 26 sanitary sewer carrier <br />pipeline crossing UPRR railroad tracks <br />at Heller St. <br />15" PVC SDR 26 Storm Drain Line <br />5. <br />Abandon existing 6" diameter or smaller <br />6. <br />Sanitary Sewer Line and fill with <br />concrete slurry mix (contingent) <br />7. <br />Install new Sanitary Sewer Manhole <br />8 <br />Replace existing Sanitary Sewer <br />Manhole <br />9 <br />Remove and dispose existing Sanitary <br />Sewer Manhole <br />BID FORM <br />2020-2021 SANITARY SEWER REPLACEMENT PROJECT <br />EstimatedI Unit Unit Price Total Item <br />Quantity Cost <br />1 LS $ $ <br />100,000.00 100,000.00 <br />1 LS $ $ <br />l 45,000.00 45,000.00 <br />7245 LF` I $ 11,111,250.0( <br />1 250.00 <br />1 LS $ $ <br />100, 000.000 100,000-00 <br />61 LF $ 400.00 $ 24,400.00 <br />1 LF $ $ <br />5,000.00 5,000.00 <br />4 EA $ 6,000.00 $ 24,000.00 <br />44 EA $ 6,000.00 $264,000.00 <br />44 EA $ $ <br />700.00 30,800.00 <br />004113-2 <br />