Laserfiche WebLink
BUBBLE UP <br />X <br />5" SQUARE GRATE NDS <br />GRATE OR EQUAL PLANTING <br />6" SOLID PVC PER LANDSCAPE PLANS <br />2-4" COBBLES AROUND RISER PIPE <br />BUBBLE UP GRATE , Ili i� <br />NATIVE SOIL <br />NOTES: <br />JJ i � I I 11I <br />NATIVE SOIL <br />WRAP PERFORATED PIP WITH <br />13EOTEXTILE FILTER FABRIC TO <br />MINIMIZE CLOGGING <br />jMIRAFI 700 OR EQUIVALENT) <br />AGGREGATE ROCK LAYER <br />1.5" TO 2.5" DIAMETER <br />JI <br />48" PERFORATED STORAGE PIPE <br />NOT TO SCALE <br />CONTRACTOR TO RIP BOTTOM OF TRENCH PRIOR TO <br />BACKFILLING WITH GRAVEL AND LAYING OF PERFORATED <br />PIPE. <br />2. CONTRACTOR SHALL CONSULT AND FOLLOW PIPE <br />MANUFACTURE RECOMMENDATIONS FOR PIPE INSTALLATION <br />TO ENSURE LONG TERM PERFORMANCE OF PIPE. <br />3. CONTRACTOR TO CAP BOTH ENDS OF PERFORATED PIPE. <br />4. PER REDWOOD CITY MUNICIPAL CODE A PERMANENT <br />STORMWATER TREATMENT MEASURE IS TO BE PROVIDED. <br />REQUIRED VOLUME OF TREATMENT IS PER SMCWPPP <br />VOLUME CAPTURE SPREADSHEET. AT A MINIMUM 224 OF OF <br />RUNOFF VOLUME CAPTURE IS TO BE PROVIDED. <br />10.1.11.11111.E <br />380 ALAMEDA DE LAS PUGLAS <br />CITY OF REDWOOD CITY SAN MATEO COUNTY CALIFORNIA <br />DATE: MAY 5,2022 SCALE: V=20' <br />PAGE 2 OP 2 <br />SANRAMON (925)866-0322 <br />SACRAMENTO (916)375-1877 <br />W W W.C9ANOG COM <br />CIVIL ENGINEERS • SURVEYORS • PLANNERS <br />F93085-0001REDW0OD CIUY380 ALAMEDA DE LAS PULGASIACAMEXHIBITMB-EXHIBITB 0&M 380 ALAMEDA DE LAS PULGAS.DWG <br />ATTYIAGR.2022.365Nasusen Subhash Patil and Vaishnavi Devi Kareddy (Page 11 of 14) <br />