My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2023-005136 STMMA - 380 Alameda De Las Pulgas_2.3.2023
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2023-005136 STMMA - 380 Alameda De Las Pulgas_2.3.2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 9:40:49 AM
Creation date
2/8/2023 2:25:34 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Doc Num
2023-005136
Rec Date
2/3/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUBBLE UP <br />5" SQUARE GRATE NDS <br />GRATE OR EQUAL <br />2-4" COBBLES AROUND <br />BUBBLE UP GRATE <br />NATIVE SOIL <br />I(,��1i11111 Ilali� N-" <br />lf 11 IIII'alll <br />1 _I i , ; I I 1___.1 I f �II-11 I-- <br />I— 11`I 1— <br />-III-I 1 <br />=1 i- <br />-I <br />i�l l l- <br />48" PERFORATED PVC PIPE �I <br />TO DIFFUSE STORM WATER-- <br />TO <br />ATER-TO GRAVEL SECTION I =I <br />(HOLES FACE DOWN) =1 _ <br />I <br />I 1 I T 1 � 1 I I <br />NOTES: <br />PLANTING <br />6" SOLID PVC PER LANDSCAPE PLANS <br />RISER PIPE <br />I l l -I I I^I I I^ <br />N- I I-1 _1 I�71 11 - <br />I <br />—11 - NATIVE SOIL <br />1=1 I TI <br />�I <br />1 1=1 <br />�Il <br />-I WRAP PERFORATED PIP WITH <br />>;EQTEX LE FILTER FABRIC TO <br />-1 + MINIMIZE CLOGGING <br />—1 11--jMIRAFI 700 OR EQUIVALENT) <br />I I�11 <br />Il�l1 <br />48" PERFORATED STORAGE PIPE <br />NOT TO SCALE <br />CONTRACTOR TO RIP BOTTOM OF TRENCH PRIOR TO <br />BACKFILLING WITH GRAVEL AND LAYING OF PERFORATED <br />PIPE. <br />2. CONTRACTOR SHALL CONSULT AND FOLLOW PIPE <br />MANUFACTURE RECOMMENDATIONS FOR PIPE INSTALLATION <br />TO ENSURE LONG TERM PERFORMANCE OF PIPE. <br />3. CONTRACTOR TO CAP BOTH ENDS OF PERFORATED PIPE. <br />4. PER REDWOOD CITY MUNICIPAL CODE A PERMANENT <br />STORMWATER TREATMENT MEASURE IS TO BE PROVIDED, <br />REQUIRED VOLUME OF TREATMENT IS PER SMCWPPP <br />VOLUME CAPTURE SPREADSHEET. AT A MINIMUM 224 CF OF <br />RUNOFF VOLUME CAPTURE IS TO BE PROVIDED. <br />AGGREGATE ROCK LAYER <br />1.5" TO 2.5" DIAMETER <br />EXHIBIT B <br />380 ALAMEDA DE LAS PUGLAS <br />CITY OF REDWOOD CITY SAN MATEO COUNTY CALIFORNIA <br />DATE: MAY 5, 2022 SCALE: V=20' <br />PAGE 2 OF 2 <br />C b SAN SACRAMENTO <br />(916) 375-0322 <br />1877 <br />SACRAMENTO (916) 375-1077 <br />WWW.CBANDG.COM <br />CIVIL ENGINEERS • SURVEYORS • PLANNERS <br />RQ085-000\REDWOOD CITY1380 ALAMEDA DE LAS PULGASIACADIEXHIBITSVB-EXHIBIT B_0&M 380 ALAMEDA DE LAS PULGAS.DWG <br />ATTY/AGR.2022.365/Vasusen Subhash Patil and Vaishnavi Devi Kareddy (Page 11 of 14) <br />
The URL can be used to link to this page
Your browser does not support the video tag.