My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2023-001826 242 Walnut Street
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2023
>
RecDoc2023-001826 242 Walnut Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 2:29:59 PM
Creation date
2/8/2023 2:29:35 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Improvemenr Agreement
Doc Num
2023-001826
Rec Date
1/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the Work, will be present on the Property during the performance of the Work, and may <br />not be changed without advance notification to and the concurrence of the City Engineer. <br />9. Examination of Work. All of the Work will be consistent with the <br />Improvement Plans and performed to the satisfaction of the City Engineer, in their <br />reasonable discretion. City and its authorized agents will, at all times during the <br />performance of the Work, have free access to the Property and the Work and will be <br />allowed to examine the Work and all materials used and to be used in the Work. <br />10. City Costs, De -posit. Developer will pay to City the actual cost for all <br />engineering, inspection, administration, plan check, laboratory and field-testing, <br />construction, and other services furnished by City in connection with this Agreement, <br />including those performed by consultants under contract with City ("City Costs"). <br />Developer will deposit with City the sum of eleven thousand two hundred forty three <br />dollars and thirty four cents ($11,243.34) ("Deposit") to compensate City for all City Costs. <br />Developer understands that the Deposit is an estimate and further agrees to pay to City <br />the actual cost of providing such services, in accordance with City's current fees. <br />Developer will complete payment of such additional sum or sums for the services <br />provided by City, if any, within thirty (30) days after billing by City of the additional sum to <br />be paid, and the amount payable will be increased by ten percent (10%) in the event <br />payment is not made within such thirty (30) day period. Any part of the Deposit or such <br />additional sum or sums not utilized by City will be returned promptly to Developer. <br />11. Completion of Work. After Developer (a) completes the Work in accordance <br />with the Improvement Plans and the terms and conditions of this Agreement, (b) repairs <br />any private or public property damaged as a result of the Work or pays the full cost of <br />such repair to the owner whose property was damaged and (c) obtains the written <br />acceptance of such repair or payment from any owner whose private property was <br />repaired by Developer or to whom Developer paid the full cost of such repair, Developer <br />will provide City with a written notice of completion, together with copies of all written <br />acceptances. <br />12. Performance. Labor and Materials and Warrantv Securit <br />12.1 Developer shall post cash or a performance bond in the amount of <br />$117,762.00 (100% of the estimated cost of improvements) to ensure satisfactory <br />completion of Developer's work performed in, on or under any right-of-way or City <br />property and to insure adequate maintenance of encroachments in accordance <br />with the provided Faithful Performance <br />12.2 If the improvement security is a corporate surety bond and, in the <br />opinion of City, any surety or sureties thereon become insufficient, Developer will <br />renew or replace any such surety with good and sufficient surety or sureties within <br />ten (10) days after receiving written demand thereof from City. <br />12.3 Improvement security consisting of corporate surety bonds will be <br />kept on file with the City Engineer. If a corporate surety bond is replaced by another <br />REV: 09-23-22 JB <br />ATTY/AGR.2022.359/PBA II, LLC (242 Walnut Street) (Page 4 of 15) <br />
The URL can be used to link to this page
Your browser does not support the video tag.