My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2023-003644 275 Blomquist
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Agreements
>
2023
>
RecDoc 2023-003644 275 Blomquist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2023 9:24:06 AM
Creation date
3/3/2023 9:23:15 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA
Doc Num
2023-003644
Rec Date
1/25/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flow -Through Planter Maintenance Plan Date of Inspection: <br />Property Address: 275 Blomquist Street Treatment Measure No.: <br />Table 1 <br />Routine Maintenance Activities for Flow -Through Planters <br />3 <br />Check that mulch is 3" deep and replenish as necessary. It is recommended that <br />As needed <br />composted arbor mulch be applied once per year to maintain the 3" depth in all <br />bare soil areas except within six inches of tree trunks. <br />4 <br />Check that soil is at appropriate depth. Till or replace soil with the approved <br />Before wet season and as <br />biotreatment soil mix as necessary to maintain a minimum of 6 inches between <br />necessary <br />top of mulch and overflow weir. <br />5 <br />Remove accumulated sediment, litter and debris from flow-through planter and <br />Before wet season and as <br />dispose of properly. Confirm that no clogging will occur and that the box will <br />necessary <br />drain within three to four hours. <br />6 <br />Inspect flow-through planter to ensure that there are no clogs. Test with garden <br />Monthly during the wet season, <br />hose to confirm that the planter will drain within three to four hours. <br />and as needed after storm events <br />7 <br />Inspect downspouts from rooftops and sheet flow from paved areas to ensure <br />Monthly during the wet season, <br />flow to planter box is unimpeded. Remove debris and repair damaged pipes. <br />and as needed after storm events <br />Check splash blocks or rocks and repair, replace and replenish as necessary. <br />8 <br />Inspect overflow pipe to ensure that it will safely convey excess flows to storm <br />Before the wet season, and as <br />drain. Repair or replace any damaged or disconnected piping, <br />necessary <br />9 <br />Inspect flow-through planter to ensure that box is structurally sound (no cracks or <br />Annually <br />leaks). Repair as necessary. <br />10 <br />Inspect flow-through planter using the attached inspection checklist. <br />Monthly, or after large storm <br />events, and after removal of <br />accumulated debris or material <br />II. Prohibitions <br />Do not use pesticides or other chemical applications to treat diseased plants, control weeds or removed <br />unwanted growth. Employ non -chemical controls (biological, physical and cultural controls) to treat a pest <br />problem. Prune plants properly and at the appropriate time of year. Provide adequate irrigation for <br />landscape plants. Do not over water. <br />III. Mosquito Abatement <br />Page 2 <br />ATTY/AGR.2022.133/County of San Mateo (275 Blomquist - County Navigation Center) (Page 15 of 20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.