Laserfiche WebLink
Bioretention Area Maintenance Plan for <br />955 Woodside Rd. <br />7/28/22 <br />Project Address and Cross Streets: 955 Woodside Road, Redwood City, CA <br />Assessor's Parcel No.: 059-240-670 <br />Property Owner: 955 Woodside Rd., LLC Phone No.: (206) 931-4169 <br />Designated Contact: Sarnir Sharma Phone No.. (206) 931-4169 <br />Mailing Address: 237 Castro St. Suite 224 Mountain View CA 94040 <br />The property contains 3 bioretention area(s), located as described below and as shown in <br />the attached site plan'. <br />Bioretention Area No. 1 is located North-west of subject property <br />Bioretention Area No. 2 is located South-west of subject property <br />Bioretention Area No. 3 is located East of subject property <br />I. Routine Maintenance Activities <br />The principal maintenance objective is to prevent sediment buildup and clogging, which <br />reduces pollutant removal efficiency and may lead to bioretention area failure. Routine <br />maintenance activities, and the frequency at which they will be conducted, are shown in <br />Table 1. <br />Table 1 <br />Routine Maintenance Activities for Bioretention Areas <br />No, <br />Maintenance Task <br />Frequency of Task <br />1 <br />Remove obstructions, weeds, debris and trash from <br />Quarterly, or as needed after storm <br />bioretention area and its inlets and outlets; and dispose of <br />events <br />properly. <br />2 <br />Inspect bioretention area for standing water, If standing <br />Quarterly, or as needed after storm <br />water does not drain within 2-3 days, till and replace the <br />events <br />surface biotreatment soil with the approved soil mix and <br />replant <br />3 <br />Check underdrains for clogging. Use the cleanout riser to <br />Quarterly, or as needed after storm <br />clean any clogged underdrains. <br />events <br />4 <br />Maintain the irrigation system and ensure that plants are <br />Quarterly <br />receiving the correct amount of water (if applicable) - <br />5 <br />Ensure that the vegetation is healthy and dense enough <br />Annually, before the wet season <br />to provide filtering and protect soils from erosion. Prune <br />begins <br />and weed the bioretention area. Remove and/or replace <br />any dead plants. <br />6 <br />Use compost and other natural soil amendments and <br />Annually, before the wet season <br />fertilizers instead of synthetic fertilizers, especially if the <br />begins <br />system uses an underdrain. <br />Annually, before the wet season <br />7 <br />Check that mulch is at appropriate depth (2 - 3 inches per <br />soil specifications) and replenish as necessary before wet <br />begins <br />season begins. It is recommended that 2" — 3" of arbor <br />mulch be reapplied every year. <br />8 <br />Inspect the energy dissipation at the inlet to ensure it is <br />Annually, before the wet season <br />functioning adequately, and that there is no scour of the <br />begins <br />surface mulch Remove accumulated sediment. <br />' Attached site plan must match the site plan exhibit to Maintenance Agreement, <br />Page 1 <br />Al-TY/AGR.2022.403/955 Woodside Rd, LLC (Page 16 of 18) <br />