My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 Kimley-Horn and Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 Kimley-Horn and Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 2:50:47 PM
Creation date
5/19/2023 2:50:30 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
On-call Transportation Services
RMP File Number
304
Date
5/5/2023
MO Ref
23-055
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 03-15-23 JB <br />D.Traffic Operations. Simulate isolated signals and corridors, develop improvement <br />plans for intersection modifications (modified lane configurations, signal timing <br />changes, new traffic controls, signal modifications), evaluate and respond to a <br />variety of community requests (e.g., stop signs, traffic signals, streetlights), collect <br />multimodal data and update engineering and traffic surveys. Example projects <br />include: Jefferson/Middlefield Intersection Modifications, Transportation <br />Monitoring Dashboard (https://www.redwoodcity.org/departments/community- <br />development-and-transportation/engineering-transportation/transportation-and- <br />parking/transportation-monitoring-report) and Vision Zero Implementation. <br />E.Design Services. Complete feasibility and planning studies for transportation <br />facilities. Example projects include: Blomquist Bridge (preliminary design), <br />Pavement Maintenance (PS&E) and Roosevelt Traffic Calming (PS&E). <br />F.Community Outreach. Conduct inclusive community outreach in support of <br />various plans and projects that engages a broad spectrum of stakeholders with <br />tailored methods and materials. Example projects include: Grade Separation and <br />Transit Center Project and El Camino Real Bike Lanes. <br />G.Grant Writing Support. Develop grant applications for a variety of multimodal <br />programs, as needed. <br />Hourly Labor Rate Schedule <br />Classification Rate <br />Analyst I $120-$150 <br />Analyst II $150-$180 <br />Professional $150-$215 <br />Senior Professional I $215-$295 <br />Senior Professional II $295-$350 <br />Senior Technical Support $155-$270 <br />Technical Support $95-$155 <br />Support Staff $80-$135 <br />*Effective through June 30, 2023, subject to annual adjustment thereafter if approved in <br />writing by the City Engineer after request from the Consultant. <br />*Internal Reimbursable Expenses will be charged to 5% of Labor billings <br />*External Reimbursable Expenses will be charged at actual cost <br />*Sub-consultants will be billed per the Contract <br />ATTY/AGR.2023.052/Kimley-Horn (On-Call Engineering Services) (Page 12 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.