Laserfiche WebLink
REV: 4-5-2023 MI <br />Exhibit B <br />System Removal Scope of Work <br />(1) Remove major equipment (BESS container, batteries, controller, strut racks, independent <br />electrical equipment) <br />(2) Leave any foundation/concrete in place. <br />(3) Leave any existing fencing if desired by Customer <br />(4) Cut and cap conduit <br />(5) Remove and recycle copper wire <br />ATTY/AGR.2023.065/Engie (Battery Storage Decommissioning) (Page 6 of 6)