My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 FBD Vanguard Construction, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 FBD Vanguard Construction, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 2:32:19 PM
Creation date
6/22/2023 2:31:53 PM
Metadata
Fields
Template:
Agreement
Contractor Name
FBD Vanguard Construction, Inc
PROJECT NAME
Redwood Avenue Sidewalk curb and gutter improvement project
RMP File Number
304.5
Date
6/7/2023
MO Ref
23-050
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15 <br />Concrete curb ramp <br />type C <br />38 <br />EA <br />$ 3,2-00 <br />$ 3 t �� 606 <br />16 <br />Concrete driveway <br />apron <br />65 <br />EA <br />$ 3100 <br />$ 19 57, 000 <br />17 <br />Minor items <br />1 <br />1,700 <br />LS <br />SF <br />$ 2d, Cta <br />$ ZO/ CSO <br />18 <br />Mulch <br />$ 2; *.}d <br />$ 41 ! <br />19 <br />Planting of trees <br />72 <br />EA <br />$ rJ 00 <br />$SOl Lf 00 <br />Total <br />Total Bid <br />Price <br />�, (OG-' '7 $ <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis <br />item, the unit price shall prevail and shall be utilized as the basis for determining the lowest <br />responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, <br />unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the <br />"Total Item Cost" column, then the amount set forth in the 'Total Item Cost" column for the item <br />shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained <br />shall be the Unit Price. <br />For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit <br />prices and any apparent errors in the addition of lump sum and extended prices. <br />Alternate No. <br />! Description Alternate Price $ <br />1 <br />$ <br />2 <br />$ <br />3 <br />$ <br />The undersigned acknowledges that the Apparent Low Bidder will be determined as <br />provided in Documents 00 1113 (Notice to Bidders) and Document 00 2113 (Instruction <br />to Bidders). <br />6. Subcontractors for work are listed on Document 00 4314 (Subcontractors List), submitted <br />herewith. <br />7. The undersigned Bidder understands that City reserves the right to reject this Bid. <br />If written notice of the acceptance of this Bid, hereinafter referred to as Notice of Award, <br />Is mailed or delivered to the undersigned Bidder within the time described in Paragraph 2 <br />of this Document 00 4113 or at any other time thereafter before it is withdrawn, the <br />undersigned Bidder will execute and dellver the documents required by Document <br />00 2113 (Instructions to Bidders) within the times specified therein. <br />9. Notice of Award or request for additional information may be addressed to the undersigned <br />Bidder at the address set forth below. <br />BID FORM 004113-3 <br />REDWOOD AVENUE SIDEWALK CURB AND GUTTER IMPROVEMENT PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.