Laserfiche WebLink
<br />Page 23 of 36 <br />June 16, 2022 Project B26030-000 <br />185.683.001 Redwood City Public Library <br /> Downtown Branch <br /> <br />“Use or disclosure of proposal data is subject to the restriction(s) on the confidentiality page of this proposal.” <br />PRICING <br />Redwood City Public Library – Main Branch <br />Pricing Option 4 Price <br />Sortation System –Interior system- 2 patron induction, staff induction <br />and 12 sort destinations <br /> Lyngsoe Dwg: B26185-000-4-0 <br />Sortation System <br />• Qty (2) Library Mate™ LM1200 Interior check in station (RFID) with <br />touchscreen interface, patron shelf, and patron receipt printer <br />▪ (2) Custom Faceplate with Rear Printer Access <br />• Qty (1) Sort Mate™ Sorter <br />▪ (11) Sort Trolley destinations with chute full capability <br />▪ (1) exceptions destination <br />▪ (1) LSC Lyngsoe Sort Controller <br />• Qty (1) Ergo Staff™ ES1200 Staff induction check in station (RFID) with <br />touchscreen interface, height adjustable work surface, backdating <br />• Qty (4) Conveyance <br />• Qty (2) Lift Gate Conveyance <br />• Qty (1) Emergency stops <br />• Qty (1) Color Graphical Display <br />• Installation <br />• Commissioning <br />• Shipping <br />• Parts Warranty (Standard 12 month) <br />• Hotline (24/7) – (Standard 12 month) <br />• On-Site Spare Parts kit <br />Equipment pricing $270,764 <br />Sort Bins <br />• Qty (12) Sort Trolleys Standard <br />Sort Trolleys $14,400 <br />Removal and Disposal of Existing Sorter $6,000 <br /> <br />Total USD $291,164 <br />Tax (9.88%) $28,767 <br />Grand Total $319,931