Laserfiche WebLink
<br />Page 28 of 36 <br />June 16, 2022 Project B26030-000 <br />185.683.001 Redwood City Public Library <br /> Downtown Branch <br /> <br />“Use or disclosure of proposal data is subject to the restriction(s) on the confidentiality page of this proposal.” <br />OWNER’S RESPONSIBILITIES <br />a) Provide any necessary permits and/or licenses. <br />b) Provide power to a location near the sorter and coordinated points near the conveyor route <br />(within 10 feet) 120V single phase. <br />c) If required, provide details of structural, or imbedded obstructions within floor or ceiling <br />structures. X-ray or other methods is not included unless otherwise specified. <br />d) Provide one network drops per Library Mate™ or Ergo Staff™, one for each sorter for <br />communication and support, and one for onsite commissioner. <br />e) Provide one SIP license for each check-in station. <br />f) Allow for site to site VPN (IPSEC) for commissioning and ongoing hotline support. Additional <br />details contained in LS Remote Customer Support document <br />g) Provide a clear path for access to and from the installation site for personnel and equipment. <br />h) Provide secure, dry, convenient storage for equipment, tools and materials used on site. <br />i) Provide adequate working space for the installation crew. Provide lighting for installation at the <br />location where the work is to be performed. Provide parking and restroom facilities. Provide <br />onsite security. <br />j) If special lift equipment is required, Lyngsoe Systems must have access to a ramp door. <br />k) Areas of installation to be broom swept by other contractors prior to the start of Lyngsoe <br />Systems installation. <br />l) Provide no later than the scheduled start of installation date, the installation site free and clear <br />and ready for Lyngsoe Systems to begin installation. Lyngsoe Systems acknowledges that some <br />degree of facility construction may be underway during installation. The Purchaser <br />acknowledges its responsibility to minimize possible resulting disruptions to Lyngsoe Systems’ <br />installation process. <br />m) Provide no later than start of installation date, all civil work and necessary removal or <br />modifications of existing equipment or buildings. For instance, the building modifications <br />required for the installation of the Library Mates™ in exterior or interior walls, and penetration <br />points through walls required by the conveyor run. Architectural finishing of penetration points <br />after installation of Library Mates™ if required.