Laserfiche WebLink
<br />Page 23 of 36 <br />June 16, 2022 Project B26030-000 <br />185.555.005 Redwood City Public Library <br /> Redwood Shores Branch <br /> <br />“Use or disclosure of proposal data is subject to the restriction(s) on the confidentiality page of this proposal.” <br />PRICING <br />Redwood City Public Library Library – Redwood Shores Branch <br />Pricing Price <br />Sortation System –Exterior system- 2 patron induction, staff induction <br />and 13 sort destinations <br /> Lyngsoe Dwg: B26030-000-5-0 <br />Sortation System <br />• Qty (2) LM2100 Exterior Library Mate™ check in station (RFID) with <br />touchscreen interface and patron receipt printing <br />▪ Qty (2) Tunnel Mount Fire Suppression <br />• Qty (1) Sort Mate™ Sorter <br />▪ (12) Sort Trolley destinations with chute full capability <br />▪ (1) exceptions destination <br />▪ (1) LSC Lyngsoe Sort Controller <br />• Qty (1) Ergo Staff™ ES1200 Staff induction check in station (RFID) with <br />touchscreen interface, height adjustable work surface, backdating <br />• Qty (2) Conveyance <br />• Qty (1) Liftgate conveyance <br />• Qty (1) Emergency stops <br />• Qty (1) Color Graphical Display <br />• Installation <br />• Commissioning <br />• Shipping <br />• Parts Warranty (Standard 12 month) <br />• Hotline (24/7) – (Standard 12 month) <br />• On-Site Spare Parts kit <br />Equipment pricing $235,863 <br />Sort Bins <br />• Qty (13) Sort Trolleys Standard Size - 24x24x33 <br />Sort Trolleys $15,600 <br />Removal and Disposal of Existing Sorter $6,000 <br /> <br />Total USD $257,463 <br />Tax (9.88%) $25,437 <br />Grand Total $282,900