My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 San Mateo County Transportation Authority Bikeway Corridor Project
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 San Mateo County Transportation Authority Bikeway Corridor Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 2:50:25 PM
Creation date
6/22/2023 2:49:57 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
San Mateo County Transportation Authority - Funding Agreement for Access to DT Bikeway Corridors
RMP File Number
304
Date
6/14/2023
Reso Ref
16076
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PED/BIKE PROGRAM 2022 CALL FOR PROJECTS <br />San Mateo County Transportation Authority/City of Redwood City <br />Access to Downtown Bikeway Corridors Project <br />REV: 06-07-23 SK <br />19458381.2 <br />WHEREAS, the TA and Sponsor desire to enter into this Agreement to establish the process, <br />terms and conditions governing the allocation and expenditure of Measure W Funds on the Project. <br />Now therefore, the Parties agree as follows: <br />SECTION 1: Scope of Work Oversight and Reporting <br />1.1 Sponsor Oversight; Work Plan. Sponsor is responsible for the completion of the Scope <br />of Work as described in Exhibit A, "Scope of Work Information," and further detailed in <br />Exhibit B, "Excerpts from the Project’s Cycle 6 Measures A and W Pedestrian and Bicycle <br />Program Funding Application." Exhibits A and B are attached to this Agreement and <br />incorporated herein by this reference. In the event that Exhibit A and Exhibit B conflict, <br />Exhibit A will control. Sponsor is responsible for procuring and administering any <br />professional service and/or other contracts entered into in connection with the Scope of <br />Work. Sponsor will oversee completion of the Scope of Work. Sponsor may appoint a <br />designee or engage contractor(s) to perform work necessary for Scope of Work completion, <br />but Sponsor remains responsible to the TA for the completion of the Scope of Work. <br />1.2 Required Approvals. Prior to commencement of the Scope of Work, Sponsor or its <br />designee (e.g., a consultant) will obtain all applicable local, state and federal approvals and <br />permits for the Scope of Work. In addition, Sponsor must comply with all applicable <br />federal, state and local laws and regulations applicable to the Project. Any right-of-way <br />activities involving property on the Caltrans right-of-way must be conducted in accordance <br />with the current version of the Caltrans Right-of-Way manual, and must be based upon <br />appraisals developed in compliance with USPAP. <br />1.3 Contract Award and Change Orders. Sponsor must comply with state and local agency <br />requirements for the award of any contract(s) for the performance of the Scope of Work <br />and any change orders. As the Scope of Work proceeds, Sponsor must advise the TA of <br />any contracts awarded and change orders as part of the regular progress reporting <br />requirements (Section 1.4). Notice of any contracts and change orders provided to the TA <br />will not constitute approval by the TA of the contracts and change orders nor obligate the <br />TA to provide funds in excess of its maximum contribution stated in Section 2.1 of this <br />Agreement. <br />1.4 Progress Reports. Sponsor will prepare and submit to the TA quarterly progress reports <br />during the entire term of the Scope of Work and covering all Scope of Work activities for <br />work completed during the previous quarter using the template in Exhibit C. The reports <br />must describe: <br />ATTY/AGR.2023.125/San Mateo County Transportation Authority (Funding Agreement-Access to Downtown Bikeway Corri) (Page 2 of 21)
The URL can be used to link to this page
Your browser does not support the video tag.