REV: 05-05-23 JB <br />NOW THEREFORE, THE PARTIES AGREE AS FOLLOWS: <br />SECTION 1: Scope of Work Oversight and Reporting <br />1.1 Sponsor Oversight; Work Plan. Sponsor is responsible for the completion of the Scope <br />of Work as described in Exhibit A, “Scope of Work Information,” and further detailed in <br />Exhibit B, “Excerpts from the Project’s Cycle 6 Measures A and W Pedestrian and Bicycle <br />Program Funding Application.” Exhibits A and B are attached to this Agreement and <br />incorporated herein by this reference. In the event that Exhibit A and Exhibit B conflict, <br />Exhibit A will control. Sponsor is responsible for procuring and administering any <br />professional service and/or other contracts entered into in connection with the Scope of <br />Work. Sponsor will oversee completion of the Scope of Work. Sponsor may appoint a <br />designee or engage contractor(s) to perform work necessary for Scope of Work completion, <br />but Sponsor remains responsible to the TA for the completion of the Scope of Work. <br />1.2 Required Approvals. Prior to commencement of the Scope of Work, Sponsor or its <br />designee (e.g., a consultant) will obtain all applicable local, state and federal approvals and <br />permits for the Scope of Work. In addition, Sponsor must comply with all applicable <br />federal, state and local laws and regulations applicable to the Project. Any right-of-way <br />activities involving property on the Caltrans right-of-way must be conducted in accordance <br />with the current version of the Caltrans Right-of-Way manual, and must be based upon <br />appraisals developed in compliance with Uniform Standards of Professional Appraisal <br />Practice (USPAP). <br />1.3 Contract Award and Change Orders. Sponsor must comply with state and local agency <br />requirements for the award of any contract(s) for the performance of the Scope of Work <br />and any change orders. As the Scope of Work proceeds, Sponsor must advise the TA of <br />any contracts awarded and change orders as part of the regular progress reporting <br />requirements (Section 1.4). Notice of any contracts and change orders provided to the TA <br />will not constitute approval by the TA of the contracts and change orders nor obligate the <br />TA to provide funds in excess of its maximum contribution stated in Section 2.1 of this <br />Agreement. <br />1.4 Progress Reports. Sponsor will prepare and submit to the TA quarterly progress reports <br />during the entire term of the Scope of Work and covering all Scope of Work activities for <br />work completed during the previous quarter using the template in Exhibit C. The reports <br />must describe: <br />a) The current status of, and any changes in, scope, schedule, budget, and funding <br />plans of the Scope of Work and the Project; <br />b) Any risk factors; <br />c) The work performed during the previous quarter and projected for the next three <br />months; <br />d) Scope of Work Costs (as defined in Section 2.1, below) projected to be expended <br />during the next three months; and <br />ATTY/AGR.2023.105/San Mateo County Transportation Authority (Redwood Ave Ped Improvements) (Page 2 of 25)