Laserfiche WebLink
13. <br />Connection to Existing 8" <br />5 <br />EA <br />$5j000 <br />$ d.151 000 <br />PVCVC <br />Valve Box Removal and Restoration <br />14. <br />15 <br />EA <br />$ Soo <br />$ .3, DO o <br />Hillcrest Way (Unincorporated San <br />Mateo County) PRV Assembly <br />Installation and Commissioning; <br />Vault Installation; Piping, <br />15. <br />Connection Exist. Water System <br />1 <br />LS <br />$ ")'?, 000 <br />$ �1 7, 000 <br />and all related work per Drawing <br />Sheets 2, 4, 6, 23 and 24 of 25. <br />Including Encroachment Permit and <br />inspection costs. <br />$aQAI. 59a <br />Total Bid Price <br />*Note on Bid Item No. 15: <br />Essential materials for this Pressure Reducing Valve (PRV), including the concrete vault; <br />pressure reducing valves; and gate valves inside the vault are provided by the City as <br />listed on Sheet 23 of 25; and shall be picked up by the Contractor at the City's Corporation <br />Yard located on Broadway Street, Redwood City and transported to the job site. The cost <br />of these materials shall not be included in this bis item price. All other pipe materials and <br />work to complete this work, including system connections; site restoration, slurry seal <br />overlay (edge to edge of the disturbed pavement), disinfection and testing per technical <br />specifications. A detailed description of this bid item is outlined on Paragraph 1.02.8.12 of <br />Section 01 1100 — Summary of Work and Work Restrictions of these Specifications. <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis <br />item, the unit price shall prevail and shall be utilized as the basis for determining the lowest <br />responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, <br />unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the <br />"Total Item Cost" column, then the amount set forth in the "Total Item Cost" column for the item <br />shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained <br />shall be the Unit Price. <br />For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit <br />prices and any apparent errors in the addition of lump sum and extended prices. <br />5. The undersigned acknowledges that the Apparent Low Bidder will be determined as <br />provided in Documents 00 1113 (Notice to Bidders) and Document 00 2113 (Instruction <br />to Bidders). <br />6. Subcontractors for work are listed on Document 00 4314 (Subcontractors List), submitted <br />herewith. <br />The undersigned Bidder understands that City reserves the right to reject this Bid. <br />BID FORM 004113-3 <br />2022-2023 Watermain Replacement Project - Redwood Village <br />and Hillcrest PRV Station <br />