Laserfiche WebLink
ATTY/RESO.0034/PC RESO RECOMMENDING CEQA APPROVAL – 505 E. BAYSHORE – EXHIBIT B <br />REV: 05-12-23 JB <br />Page 4 of 22 <br />Mitigation Monitoring or Reporting Program <br />505 East Bayshore Road Project (SCH #2021080447) <br />Impacts Mitigation Timeframe for <br />Implementation <br />Responsibility <br />for <br />Implementation <br />Oversight of <br />Implementation <br />matter exhaust in comparison to <br />uncontrolled equipment. <br />• Use of alternatively fueled or electric equipment. <br /> <br />Alternatively, the project applicant could develop a plan that <br />reduces on- and near-site construction emissions by a <br />minimum 60 percent or greater. The construction operations <br />plan shall be reviewed and approved by the Director of <br />Community Development & Transportation or the <br />Director’s designee prior to the issuance of any demolition, <br />grading, or building permits (whichever occurs earliest). <br /> <br />Impact AIR-C: <br />The project would <br />not result in a <br />cumulatively <br />considerable <br />contribution to a <br />significant air <br />quality impact with <br />mitigation <br />incorporated. <br /> <br />Less than <br />Significant Impact <br />with Mitigation <br />Incorporated <br /> <br />See MM AIR-1.1 above Same as MM AIR-1.1 <br />above <br />Same as MM <br />AIR-1.1 above <br />Same as MM <br />AIR-1.1 above