My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso 23-10 PC Reso 0035 Reso Recommending General Plan Amendment Approval - 505 E. Bayshore
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso 23-10 PC Reso 0035 Reso Recommending General Plan Amendment Approval - 505 E. Bayshore
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 3:59:58 PM
Creation date
6/22/2023 3:59:16 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0035/PC RESO RECOMMENDING GENERAL PLAN AMENDMENT APPROVAL - 505 E. BAYSHORE <br />REV: 05-12-23 JB <br />Page 2 of 32 <br />3. Exterior Colors and Materials – The applicant shall provide a mockup of the proposed <br />materials and colors for Planning review and approval prior to final foundation inspection for <br />the project. [COA][PLANNING] <br /> <br />4. Mitigation Measures - Applicant shall comply with and implement all mitigation measures <br />identified in the Final Environmental Impact Report and Mitigation Monitoring and Reporting <br />Program (MMRP). Measures shall be completed in accordance with the approved MMRP. The <br />applicant shall provide written documentation of compliance with all required mitigation <br />measures prior to issuance of final certificate of occupancy. [COA][PLANNING] <br /> <br />Fees & Fair Share Contributions <br /> <br />The following fees and fair share contributions must be paid in full prior to issuance of the <br />building permit unless otherwise described below, or the applicant elects to defer payment to <br />certificate of occupancy in accordance with Government Code Section 66007 and complies with <br />all requirements of that section. <br /> <br />5. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting from <br />the proposed project, at $9,388.50. [SDR] [ENGINEERING] <br /> <br />6. Water Fees – Pay applicable water fees as outlined on the City’s Master Fee Schedule, <br />including but not limited to Water Capacity Charge, Water System Capital Facilities Fee, Water <br />Service Tap Fee, and Water Meter Installation Fee, estimated at $93,579.31. Final fee amounts will be <br />determined based on the final, approved, project plans. [SDR] [ENGINEERING] <br /> <br />7. Sewer Fees – Pay applicable sewer fees as outlined on the City’s Master Fee Schedule, <br />including but not limited to Sewer System Capital Facilities Fee and Wastewater Treatment Capacity <br />Fee, estimated at $127,956.47. Final fee amounts will be determined based on the final, approved, <br />project plans. [SDR][ENGINEERING] <br />8. 101/84 Interchange Project Fair Share Contribution - pay a fair share contribution for the <br />net new trips resulting from the proposed project towards the construction cost of the 101/84 <br />Interchange which is not included in the Transportation Impact Fee, estimated at $163,328 <br />based on 29 net new dwelling unit equivalents. Payment is due prior to the issuance of <br />Building Permits. [SDR] [ENGINEERING] <br />9. Water Tanks – The applicant shall contribute its fair share for the cost of analysis, design, <br />construction, land acquisition for a 3 million gallon emergency water tank serving the main <br />city area estimated at $107,887 based on 56 dwelling units. Payment is due prior to the <br />issuance of Building Permits. [COA][ENGINEERING] <br /> <br />10. Blomquist Bridge – The applicant shall contribute its fair share contribution for the net new <br />trips resulting from the proposed project for the cost of analysis, design, construction, of the <br />Blomquist Bridge over Redwood Creek. The escalated cost of the project is $25M, which is <br />$15.3M more than included in the Transportation Impact Fee. The Project’s cost responsibility is <br />$19,154 based on 29 net new dwelling unit equivalents. [COA][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.