Laserfiche WebLink
ATTY/RESO.0035/PC RESO RECOMMENDING GENERAL PLAN AMENDMENT APPROVAL - 505 E. BAYSHORE <br />REV: 05-12-23 JB <br />Page 9 of 32 <br />project’s Vesting Tentative Map, dated, without written approval from the Engineering <br />Department. <br />b. Treatment Measure Inspection – Applicant shall coordinate installation of stormwater <br />treatment measures with the municipality, shall arrange to have the City’s designated <br />inspector present at the time of installation, and shall have the City’s designated inspector <br />complete a final inspection of installed stormwater treatment measure immediately after <br />installation is complete. <br /> <br />47. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that includes, <br />at a minimum, exhibit(s) showing drainage areas and location of Low Impact Development <br />(LID) treatment measures; total project site area and total area of land disturbed; total new <br />and/or replaced impervious area; treatment measures and hydraulic sizing calculations; a <br />listing of source control and site design measures to be implemented at the site; saturated <br />hydraulic conductivity rate(s) at relevant locations or hydrologic soil type (A, B, C or D) and <br />source of information; elevation of high seasonal groundwater table; and a brief summary of <br />how the project is complying with Provision C.3 of the MRP. [COA][ENGINEERING] <br /> <br />48. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices <br />(BMPs) for construction shall be implemented to protect water quality, in accordance with the <br />approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available <br />electronically for inserting into project plans. [SDR][ENGINEERING] <br /> <br />Street Infrastructure Improvements <br /> <br />49. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the <br />satisfaction of the City Engineer at project completion. When this requires additional pavement <br />restoration, the Engineer shall approve the preferred layout of pavement markings. <br />[SDR][ENGINEERING] <br /> <br />Construction-Related Activities <br /> <br />50. Pre-Construction Meeting - After City permits are approved, but prior to start of construction, <br />hold a preconstruction conference with Engineering and Building staff and other interested <br />parties. The developer shall arrange for the attendance of the construction manager, contractor, <br />and all subcontractors who are responsible for grading and erosion and sedimentation protection <br />controls. [COA][ENGINEERING] <br /> <br />51. Construction Management and Staging - Prior to encroachment permit issuance, submit a <br />construction parking management plan, which shall outline the number of construction workers <br />by phase, phase duration, where parking will be located for each phase. Construction parking, <br />material storage, equipment, or other construction-related uses are not allowed within the City <br />right of way without prior approval from the City Engineer. [COA][ENGINEERING]