My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 San Francisco City and County of Water Sales Agreement
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 San Francisco City and County of Water Sales Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 3:35:04 PM
Creation date
10/29/2009 12:43:36 PM
Metadata
Fields
Template:
Agreement
Contractor Name
San Francisco, City and County of
PROJECT NAME
Water Sales Agreement
RMP File Number
304
Date
7/1/2009
Reso Ref
14949, 15255
Amendment
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLES <br />METER CALIBRATION AND MAINTENANCE FREQUENCY <br />METERI FREQUENCY WORK TO BE PERFORMED <br />EQUIPMENT (See Work Codes Listed Below) <br />Quarterly Semi-Annual CA CL FL IN LU PT <br />Annual <br />Venturi Meters X X X X X <br />(1 )(1 ) <br />Magnetic Meters X X X X <br />(2) (2)(2) <br />Yokagowa DIP X X X X X <br />Transmitters <br />Rosemount DIP X X X X X <br />Transmitters <br />Honeywell X X X X <br />Recorders <br />Water Level Sensors X X X X <br />(Pressure Transducers) <br />SCADA Electronics X X <br />AGM Electronics X X <br />NLS Digital Displays X X <br />Electrostatic 24V DC X X <br />Power Supplies (3) <br />ASCO Solenoids X X X X <br />(4) <br />WORK CODES: <br />CA = CALIBRATE; CL = CLEAN; FL = FLUSH; IN = INSPECT; LU = LUBRICATE; PT = PITOT TUBE TEST. <br />NOTES: <br />(1) Inspection and flushing requirements for Venturi meters refer to the pressure tubing from the meter to the <br />differential pressure transmitter. <br />(2) May calibrate using clamp-on meter where conditions allow. Inspection and cleaning requirements for <br />magnetic meters refer to the sensors or probes that are inserted through the pipe walL. <br />(3) Adjust voltage if necessary. <br />(4) Replace rubber ware as needed.
The URL can be used to link to this page
Your browser does not support the video tag.