My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 Subterra Construction, Inc. Emergency Sewer Repair
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 Subterra Construction, Inc. Emergency Sewer Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2023 10:41:34 AM
Creation date
7/7/2023 10:41:26 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Subterra Construction, Inc.
RMP File Number
304.5
Date
6/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT 00 5200-3 <br /> <br />Contractor can demonstrate to City’s satisfaction that the Key Personnel were reassigned <br />and/or removed and replaced for reasons beyond Contractor’s control. <br /> ARTICLE 6 CONTRACT DOCUMENTS <br /> <br />6.01 Contract Documents consist of the following documents, including all changes, Addenda, <br />and Modifications thereto: <br /> <br />Document 00 5200 Agreement <br />Document 00 6113.13 Construction Performance Bond <br />Document 00 6113.16 Construction Labor and Material Payment Bond <br />Document 00 6325 Substitution Request Form <br />Document 00 6530 Agreement and Release of Any and All Claims <br />Document 00 6536 Guaranty <br />Document 00 7200 General Conditions <br />Document 00 7301 Supplemental General Conditions <br />Document 00 7316 Supplementary Conditions – Insurance and <br />Indemnification <br />Document 01 1100 Summary of Work and Work Restrictions <br />Document 01 2000 Measurement and Payment <br />Document 01 2600 Modification Procedures <br />Document 01 3500 Notification of Residents and Businesses <br />Document 01 4100 Regulatory Requirements <br />Document 01 4200 References and Definitions <br />Document 01 5500 Traffic Regulations <br />Document 01 7700 Contract Closeout <br />Document 01 7800 Project Record Sections <br /> <br />Document 02 1330 Stormwater Pollution Prevention <br />Document 02 2020 Trenching and Backfill <br />Document 02 2500 Asphalt Paving and Surfacing <br />Document 02 6700 Utility Polyethylene Containment Pipe Systems <br />Document 02 7300 Sanitary Sewers <br />Document 02 7310 Cleaning of Pipe <br />Document 02 7330 Point Repair <br />Document 02 7400 Flow Bypass Systems <br />Document 02 8400 Roadway Marking Accessories <br /> <br />City of Redwood City Standard Detail S-8 (November 25, 2019 and latest revision, <br />drawing attached) <br /> <br />City of Redwood City Standard Detail UT-2 (November 25, 2019 and latest <br />revision, drawing attached) <br /> <br />All other applicable City of Redwood City Standard Details (November 25, 2019 <br />and latest revision) <br /> <br />[2018] California Department of Transportation Standard Specifications and any <br />revisions thereto <br />[2018] California Department of Transportation Standard Plans and any revisions <br />thereto <br />Specifications As listed in Document 00 0110 Table of Contents <br />Schedules listed in Document 00 0115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.