Laserfiche WebLink
Findings and Statements Required by the California Environmental Quality Act <br />Redwood City DTPP Plan-Wide Amendments 34 ESA / 202100421.01 <br />Subsequent Environmental Impact Report May 2023 <br />event, except in the existing or proposed street network, compared to existing conditions, <br />as determined by the City Engineer. Final design of the improvement(s) to be undertaken <br />as part of this mitigation measure would be subject to review and approval by the City <br />Engineer to ensure consistency with the requirement not to substantially increase off-site <br />flooding, in accordance with City Engineering Standards, and development of the approved <br />improvement(s) shall become a condition of project approval for the 901 El Camino Real <br />project. <br />11. Noise and Vibration <br />Impact NO-1: Implementation of the DTPP Plan-Wide Amendments would not generate a <br />substantial temporary increase in ambient noise levels in the vicinity of the project in excess <br />of standards established in the local general plan or noise ordinance, or applicable standards <br />of other agencies. <br />Mitigation Measures. SEIR Mitigation Measure NO-1 (SEIR, pp. 11-21 to 11-22) will be <br />implemented for the Project as provided in the MMRP. <br />Findings Regarding Impact NO-1: Based on the FSEIR and the entire record before the <br />City, the Council finds that Mitigation Measure NO-1 would substantially lessen the <br />severity of Impact NO-1, such that this potential impact would be less than significant <br />because it will require conventional construction-period noise abatement measures as <br />conditions of approval for all future projects involving demolition and construction <br />activities. <br />Impact NO-2: Implementation of the DTPP Plan-Wide Amendments would not generate a <br />substantial permanent increase in ambient noise levels in the vicinity of the project in excess <br />of standards established in the local general plan or noise ordinance, or applicable standards <br />of other agencies. <br />Mitigation Measures. SEIR Mitigation Measure NO-2 (SEIR, p. 11-24) will be <br />implemented for the Project as provided in the MMRP. <br />Findings Regarding Impact NO-2: Based on the FSEIR and the entire record before the <br />City, the Council finds that Mitigation Measure NO-2 would substantially lessen the <br />severity of Impact NO-2, such that this potential impact would be less than significant <br />because an acoustical study shall be prepared by a qualified acoustical engineer during <br />final building design to evaluate the potential noise generated by building mechanical <br />equipment and to identify the necessary design measures to be incorporated to meet the <br />performance standards of Chapters 36.7.B of the City’s Redwood City Zoning Code. <br />Impact NO-3: Implementation of the DTPP Plan-Wide Amendments would not generate <br />excessive groundborne vibration or groundborne noise levels. <br />Mitigation Measures. SEIR Mitigation Measure NO-3 (SEIR, p. 11-28) will be <br />implemented for the Project as provided in the MMRP.