My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 Economic and Planning Systems, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Under $104K
>
Agmt23 Economic and Planning Systems, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2023 4:45:52 PM
Creation date
8/16/2023 12:26:43 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Fees Audit and Reporting
RMP File Number
304.5
Date
7/7/2023
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 08-25-23 VR <br />Task 2 Schedule <br />It is understood that the City is seeking a completed Nexus Study by early November for <br />City Council consideration in early December. The consultant work tasks are hence <br />envisioned to take place over the course of the 10-week period up to November 4th. <br />Participation in one-hour meetings will occur throughout this timeframe. It will be <br />necessary to receive the completed Hexagon technical analysis in September to leave <br />sufficient time for the remaining consultant tasks, including final technical review, the <br />drafting of the nexus study, and nexus study finalization. <br />Task 2 Budget <br />Due to the advisory nature of this work coupled with the expedited crafting of the Nexus <br />Study, most of the consultant work effort will be conducted by Teifion Rice-Evans with <br />some input and guidance from Ashleigh Kanat. Estimated hours and budget are shown <br />below. The budget does not include any public meetings, presentations, or work after <br />development of the nexus study. As shown, the total budget, including Task 5/ <br />Contingency, sums to $24,5000 (or $21,300 before the contingency). <br />Lead Advisor Staff <br />Subtotal <br />Direct Costs/ <br />Reimbursables <br />[2] <br />Grand <br />Total <br />Tasks Rice-Evans Kanat <br /> Hourly Billing Rates [1]$325 $300 <br />Task 1: Meetings and Input (3)10 2 $3,850 $0 $3,850 <br />Task 2: Review Technical Analysis 10 0 $3,250 $0 $3,250 <br />Task 3: Draft Nexus Study 30 2 $10,350 $0 $10,350 <br />Task 4: Refine and Finalize Nexus Study 10 2 $3,850 $0 $3,850 <br />Task 5: Contigency for Nexus Study 8 2 $3,200 $0 $3,200 <br />Total Project Budget 68 8 $24,500 $0 $24,500 <br />TOTAL PROJECT COSTS $21,300 <br />[1] Hourly billing rates are effective for 2023 and subject to annual revision. <br />[2] Direct costs/reimbursables include data acquisition (CoStar and JobsEQ) and staff travel to public meetings. <br />[3] Includes participation in 10 one-hour virtual meetings. <br />Task 3: Fee Comparison and Prototype Burden Analysis <br />For six cities (Palo Alto, Mountain View, Sunnyvale, San Bruno, San Mateo, and Daly <br />City), Consultant will gather all development impact fees and regulatory-based in-lieu fees <br />so that Redwood City is able to compare its current and proposed fee levels relative to <br />other peer jurisdictions. Planning and building fees will be excluded. Consultant will also <br />identify several development prototypes (e.g., a single family house, a multifamily <br />apartment, an office/R&D development, a retail development, and an industrial <br />development) and calculate the aggregate fee burdens in each city. Again, the goal is to <br />help Redwood City understand its current and proposed fee burdens as a way of guiding <br />ATTY/AGR.2023/Amend. No.1/Economic and Planning Systems, Inc. (EPS Fees Project) (Page 7 of 10)
The URL can be used to link to this page
Your browser does not support the video tag.