My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Tract Pump Station Improvement Project
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Tract Pump Station Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 4:49:45 PM
Creation date
12/4/2023 4:48:35 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Price Tract Pump Station Improvement Project
RMP File Number
304
Date
11/22/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-07-23 SK <br />Changes will be limited to non-structural <br />modifications such as fillets and <br />splitters, floor cones, curtain walls, <br />baffling, and other similar devices that <br />will not impact the overall size and <br />shape of the intakes. <br />Witness Test Following modification testing, a one- <br />day witness test (in-person or virtual) <br />can be held at CEH facility to <br />demonstrate the models with and <br />without the proposed modifications. <br />Preliminary modification drawings will <br />be available at the witness test. City <br />staff are encouraged to attend this test. <br />Travel costs to observe the test in- <br />person are not included. <br />Documentation Tests Following the witness test, it is <br />anticipated that up to 12 documentation <br />tests will be conducted to document the <br />performance of the pump intake with <br />the recommended modifications in <br />place. The cost of evaluating the <br />performance of the intake with the <br />proposed modifications is included. <br /> <br />Deliverables for task 3: System Recommendations Technical Memorandum (PDF), and <br />Physical Modeling Documentation (various PDFs and Video). <br />TASK 4: ALTERNATIVES ANALYSIS AND BASIS OF DESIGN REPORT <br />Subtask 4.1 – Preliminary Pump Design <br />Consultant will prepare sizing calculations to develop preliminary wet well <br />size and depth, preliminary pump selection, and preliminary discharge vault <br />sizing. Based on information available, Consultant anticipates that the new <br />pump station will have a design flow rate of 140 cfs with two duty pumps <br />operating, and up to 210 cfs with the third pump operating, and an additional <br />30 cfs low-flow pump that may operate in smaller storms and to draw down the <br />wet well following larger storm events. The pumps are anticipated to be vertical- <br />axial propeller pumps with zinc anodes. The wet well is anticipated to be a <br />rectangular, cast-in place wet well. Consultant assumes each pump will have <br />individual discharge connections to the discharge vault as well as an <br />emergency gravity bypass. Within the discharge vault, Consultant anticipates <br />each discharge pipe, and the gravity bypass will have a flap gate to prevent <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 18 of 54)
The URL can be used to link to this page
Your browser does not support the video tag.