My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Tract Pump Station Improvement Project
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Tract Pump Station Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 4:49:45 PM
Creation date
12/4/2023 4:48:35 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Price Tract Pump Station Improvement Project
RMP File Number
304
Date
11/22/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 11-07-23 SK <br />BAGG will perform an additional boring closer to the outfall. Consultant <br />assumes that the boring will not be performed on the creek or jurisdictional <br />area. <br />Optional Task 9: CEQA/NEPA & PERMITTING <br />As an optional task, Consultant will perform the following CEQA, NEPA and <br />Permitting tasks that will likely be required if the outfall of the project is <br />impacted. The specifics of this scope will depend on the actual project <br />improvements, so this scope is intended to be refined prior to starting any of <br />the work described in this optional task. The following materials will be available <br />prior to starting this task: <br />Approximately 30% design drawings on which to base the CEQA <br />analysis and modeling, including necessary technical information to <br />support the analysis of all CEQA and NEPA topics. Basing the CEQA <br />project description on 30% approved design drawings ensures the <br />CEQA and NEPA documents will be based on a stable project that won’t <br />change substantially. <br />Project narrative explaining the project features, proposed <br />construction activities and equipment as well as a summary of <br />construction phasing and duration: to be prepared by Consultant and <br />subconsultant. <br />Geotechnical Report: to be performed and prepared by consultant <br />and subconsultant. <br />Phase I/II Environmental Site Assessment: to be performed and <br />prepared by consultant and subconsultant. <br />The scope of work described in this optional task is based on the following <br />assumptions: <br />Project Changes: The work scope does not cover new or revised <br />analysis needed to address substantial changes to project design or <br />variables made during design development after the start of work, such <br />as changes in the project footprint/ limits of disturbance, construction <br />methods, etc. <br />Air Quality and Noise Modeling. The budget does not include air <br />quality modeling or ambient noise modeling. <br />AB 52 Tribal Consultation. This work scope does not include tribal <br />consultation under AB 52; however, if necessary, Basin can assist the <br />City with this process, under a supplemental scope and budget. <br />Administrative Drafts. The cost estimate assumes there will be only <br />one round of administrative review of each of the work products prior to <br />finalization of the documentation. If more administrative drafts are <br />required, the cost of additional consultants’ time and materials will be <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 33 of 54)