Laserfiche WebLink
<br />REV: 11-07-23 SK <br />CITY: City of Redwood City, <br /> 1017 Middlefield Road <br /> Redwood City, CA 94063 <br /> <br /> <br /> By: __________________________ <br /> Melissa Stevenson Diaz, City Manager <br />ATTEST: <br /> <br />_______________________________ <br />Yessika Castro, City Clerk <br /> <br /> <br />CONSULTANT: BKF Engineers <br />Brian Scott, PE <br /> Principal-In-Charge <br />255 Shoreline Drive, Suite 200, Redwood City, <br />CA, 94065. <br /> <br /> <br />*By: _________________________ **By: __________________________ <br /> <br />Printed Name: __________________ Printed Name: __________________ <br /> <br />Title: __________________________ Title: __________________________ <br /> <br /> <br />If required by City, proper notarial acknowledgment of execution by Consultant must be attached. If a Corporation, <br />Agreement must be signed by one corporate officer from each of the following two groups. <br /> <br />*Group A. **Group B. <br /> Chairman, Secretary, <br /> President, or Assistant Secretary, <br /> Vice-President CFO or Assistant Treasurer <br /> <br />Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate <br />seal empowering the officer(s) signing to bind the corporation. <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 10 of 68) <br />Brian Scott (Nov 30, 2023 10:18 PST) <br />Brian Scott <br />Brian Scott <br />Principal/Vice President <br />Jean Chen <br />CFO