Laserfiche WebLink
<br />REV: 11-07-23 SK <br />backflow and a slide gate valve will isolate the structure on the downstream <br />end. Consultant anticipates that the duty pumps will operate with a lead-lag1- <br />lag2 pumping control strategy with the third duty pump as a backup in case <br />either of the first two duty pumps fail or during very large storm events such as <br />the 100-year storm. Consultant will establish anticipated footprints for the pump <br />station wet well, discharge vault, and the control panels for use in the <br />preliminary enclosure layout. <br />Subtask 4.2 – Preliminary Pump House Layout Alternatives <br />• Consultant will prepare two (2) pump station alternative layouts for review. <br />Consultant will also provide two pipe network alternative layouts in proximity to <br />the station (i.e., intake line and discharge line). Additional layouts, if required, <br />will be provided as an additional service. Each alternative will include a <br />preliminary layout for the proposed pump station and associated site structures. <br />Consultant will prepare exhibits (10% drawings) using the topographic and <br />utility maps collected from the site survey. Consultant will identify setbacks and <br />critical equipment. The pump station is assumed to be an indoor facility <br />protected by a fence. Consultant will assume that the gate manhole with a <br />manually operated slide gate is required upstream of the wet well. Consultant <br />will assume the facility will also require a new motor control center, pad- <br />mounted transformer, lighting, gas detection panel, permanent generator and <br />standby-generator hookups, reduced pressure backflow assembly with hose <br />bib, a stainless-steel combination eyewash/drench hose unit and wash-down <br />sink. Consultant anticipates that the facility will not create and/or replace 5,000 <br />square feet or more of impervious surface, so compliance with the Provision <br />C.3 of the Municipal Regional Permit (MRP) is not anticipated to be required, <br />so design of stormwater best management practices (BMPs) is not included. <br />Design of stormwater BMPs may be provided as an additional service. <br />Consultant will review the preliminary enclosure layout with the City to obtain <br />preliminary concurrence prior to developing the 60% drawings. <br />Subtask 4.3 –Preliminary Vehicle Access <br />• Consultant will prepare a vehicle access exhibit demonstrating easy access <br />to the pump station from the adjacent road. Consultant will utilize AutoTURN <br />with turning radii provided by the City. If the City does not have specific turning <br />radii, Consultant will use typical large maintenance vehicle turning radii. <br />Consultant will also show proposed parking locations for routine visits by <br />Operations and Maintenance staff vehicles. <br />Subtask 4.4 – Surge Analysis <br />• Consultant will perform a surge analysis of the pump station to evaluate the <br />discharge pipe during an unlikely surge condition to assess maximum pipe <br />pressures. Consultant does not anticipate that surge conditions will occur, but <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 19 of 68)