My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Price Tract Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Price Tract Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:08:47 PM
Creation date
12/18/2023 2:07:26 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REV: 11-07-23 SK <br />• Consultant and their team will prepare a comment checklist that <br />includes preliminary responses and proposed revisions to address <br />each comment that will be completed as part of the 100% Final Design <br />submittal. <br />• Consultant will schedule and conduct a City Meeting as described <br />and budgeted under Task 1. <br />• City staff will review the comment checklist and confirm proposed <br />revisions are acceptable. <br />Deliverables for task 7: Electronic copy of 90% Plans (24”x36” size), Electronic copy of <br />90% Specifications (Word and PDF), Electronic copy of 90% Engineer’s Estimate (PDF), <br />Electronic copy of Structural Calculations (PDF), Electronic copy of 60% Comment <br />checklist with responses (PDF), Electronic copy of Revised BOD (PDF), and 90% <br />Submittal Comment Checklist (PDF). <br />TASK 8: 100% FINAL DESIGN SUBMITTAL <br />Subtask 8.1 – SCADA Strategy and Programming Report <br />• The subconsultant, DTN Engineers, Inc., will revise the SCADA Strategy <br />and Programming Report based on feedback from the City. DTN will coordinate <br />Contractor’s testing requirements of the SCADA/PLC program with the City. <br />SCADA/PLC programming may be provided as an optional service. <br />Subtask 8.2 – 100% Construction Documents <br />• Consultant’s team will progress the 90% Semi-Final Design Documents to <br />the 100% level. Consultant and team will once again refine the BOD prepared <br />under Task 4 and updated under Task 7. There are no anticipated updates to <br />the structural calculations for this submittal. Consultant and team will revise the <br />documents to address comments from the 90% Submittal. <br /> <br />Subtask 8.3 – Submittals and Plan Reviews <br />• Consultant will prepare the 100% Final Design Submittal to the City. The <br />City will circulate the 100% submittal to all applicable departments such as <br />Building Inspection, Engineering & Construction, Planning & Housing, the Fire <br />Department, etc. The 100 submittal and plan review process will include the <br />following tasks: <br />• City will review the 100% submittal documents and confirm all <br />comments have been addressed and there are no new comments. The <br />schedule has allocated a 4-week review period for this task. <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 26 of 68)
The URL can be used to link to this page
Your browser does not support the video tag.