<br />REV: 11-07-23 SK <br />2. Consultant’s team will notify Underground Service Alert to mark the <br />underground utilities in the exploration area; however, BAGG cannot be <br />responsible for any unanticipated conflicts of the borings with the existing <br />underground utilities that have not been properly marked, or the resulting damage. <br />Therefore, BAGG will rely on assistance from the City in the identification of the <br />existing utilities within the exploration area. Please provide to this office all existing <br />as-built utility plans that may be available. As an add alternate, an underground <br />utility locator can be hired to help clear the boring location. <br />3. The drilling duration and the related fee is an estimate; variation can and <br />sometimes do occur; therefore, it is possible for the drilling duration to exceed the <br />estimate provided by Pitcher Drilling Company. If so, the difference will be billed <br />following a change order request. <br />4. The fee for the disposal of the drum contents is an estimate; should <br />environmental profiling of the drum content conclude that the cuttings are <br />hazardous in nature, disposal fees and the required special handling of the drums <br />may vary from the estimate provided depending on the nature of the detected <br />contaminants and the disposal site. Any overage will be transferred to the client <br />following a change order request. <br />5. Special provisions to deal with or handle contaminated drill cuttings or <br />groundwater, or the need for personal protective gear pertinent to unknown site <br />contaminants other than Level D equipment (safety boots, hard hat, gloves, & <br />goggles) are not included. <br />6. The presented estimate for the site exploration is for work during normal <br />business hours; please note that the rates for work on Saturdays and Sundays or <br />after hours in normal workdays will be higher. <br />7. This optional task does not include the site characterization from a geotechnical <br />point of view as this is covered in other tasks. <br />OPTIONAL TASK 12: OUTFALL REPLACEMENT <br />1. Conceptual Layout: Concurrent with Task 4, Consultant will perform outfall apron <br />sizing calculations and develop a preliminary outfall structure and apron layout. <br />Given the regulatory requirements are not yet defined, this optional task assumes <br />that the outfall structure will be replaced in kind with a simple, reinforced concrete <br />headwall structure around the new pipe and a new riprap apron sized based on <br />the required discharge pipe size and the impacted area of the bank will not require <br />a planting plan. Geotechnical mitigation measures or bank stabilization measures <br />and not anticipated to be required; areas of the bank are assumed to be backfilled <br />with onsite fill. Irrigation of the bank is not anticipated. The improvements are not <br />anticipated to reduce the flow area in the channel, so modeling of Redwood Creek <br />is not included. BCA will assist with conceptual layout of the new outfall structure. <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 43 of 68)