My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Price Tract Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Price Tract Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:08:47 PM
Creation date
12/18/2023 2:07:26 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DESIGN APPROACH <br />City of Redwood City Price Tract Storm Drain Pump Station Improvement Project 31 <br />KEY MEMBERS <br />Michael Jacob Potholing Lead Bess Testlab, Inc. <br />QUALIFICATIONS PROJECT ROLE EXPERIENCE <br /> -Years of Experience: 16 -B.A., Administration of Justice, Cal State - Hayward -40-Hour HAZWOPER <br />Michael will provide potholing and utility locating consulting on the project. <br /> -EBMUD On-Call Services, Oakland -City of Fremont On-Call Services, Fremont -City of Tulare On-Call Services, Tulare -Perimeter Security, BART Richmond Yard Rehabilitation, Richmond <br />As Needed <br />Mike Campbell, AICP CEQA/NEPA Compliance Lead MIG, Inc. <br />QUALIFICATIONS PROJECT ROLE EXPERIENCE <br /> -Years of Experience: 35 -B.S., Natural Resources Planning & Interpretation, Humboldt State University -American Institute of Certified Planners (AICP) -Certified Professional in Storm Water Quality (CPSWQ) <br />Mike will assist with all aspects of the CEQA and NEPA processes including project scoping, notification requirements, public meetings and project findings. <br /> -Red Morton Community Park Stormwater Capture Project, Redwood City -Annual Water Main Replacement Project 19-21, Mountain View -Mitigation Monitoring and Reporting Programs (MMRPS) -Environmental Impact Documentation -Clean Water Act Section 401 and 404 Permits -BCDC SF Bay Administrative Permits <br />TASK 5 <br />David Werth, Ph.D, PE Physical Modeling Lead Clemson Engineering Hydraulics, Inc. <br />QUALIFICATIONS PROJECT ROLE EXPERIENCE <br /> -Years of Experience: 29 -Ph.D, & M.S., Civil Engineering - Fluid Mechanics/Hydraulics, Utah State University -B.S., Forest/Environmental Resource Engineering, State University of New York <br />Dr. Werth has over 29 years of hydraulic modeling experience and specializes in physical hydraulic modeling, pump station and intake design, hydraulic structure analysis, pipeline hydraulic studies and energy losses in both open and closed conduit flow regimes. Dr. Werth has conducted over 1000 physical hydraulic model and lab studies including pump intake structures for water & wastewater, control structures, mixing systems, diversion works, closed conduits, river works and erosion control structures, cavitation, transients, energy loss, and dissipation and efficiency. <br /> -Municipal Pump Stations, Various Locations -Raw Water Intakes, Various Locations -Water/Wastewater Pump Stations, Various Locations -Stormwater/Deep Tunnel/CSO/Flood Control Pump Stations, Various Locations -Energy Dissipation and Mixing Systems, Various Locations <br />TASK 3 <br />REV: 11-07-23 SK <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 51 of 68)
The URL can be used to link to this page
Your browser does not support the video tag.