My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt23 BKF Engineers Price Tract Pump Station
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2023
>
Agmt23 BKF Engineers Price Tract Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:08:47 PM
Creation date
12/18/2023 2:07:26 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Price Pump Station Design
RMP File Number
304
Date
12/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Redwood City Price Tract Storm Drain Pump Station Improvement Project <br />Matt CummickSurvey Chainman Survey support services for project.2 1 <br />Janas EndfingerProject Assistant Administrative support services for project.1,4,7,8 <br />Norm Dyer, CASpArchitect <br />Norm will be the as needed designated architect. Norm is a CASp certified registered architect with more than 44 years of development consulting experience related to site development, grading, and ADA design. <br />AS needed <br />BIGGS CARDOSA, INC.ROLE TASK OPTIONAL TASK <br />Dan Devlin Principal-in-Charge <br />Will serve as Principal-in-Charge and QAQC Manager including overseeing the independent quality control checks including the review of project assumptions and design criteria, analysis of modeling assumptions, results, calculations, and coordination with other disciplines. <br />7 <br />Anthony Notaro, PE Associate <br />Will serve as Structures Project Manager, including overseeing structural inspections and will provide recommendations for the repair or replacement of structures. Leading the design of all structural elements and conduct quality control reviews in addition to resolving any design challenges. <br />2,6,7,8,9 <br />Francisco Castillo Engineering Manager <br />Will serve as Structures Project Engineer, including preparation of design documents, which require analysis and design. He will work with the Project Manager to assist in meeting the project quality, schedule, and cost goals. He will be responsible for reviewing the as-built documents, performing the site visits, conducting evaluations of both existing and proposed structures, and preparing the final deliverable documents. <br />2,6,7,8,9 <br />Toan NguyenStaff Engineer <br />Will serve as Structural Staff Engineer, including participating in field assessments, structural design and analysis, assisting in the layout of structural drawings, review of other engineers’ work for in-house quality control and production of contract documents. <br />2,6,7,8 <br />Steve HickeyDrafter <br />Will serve as a CADD Drafter, including preparation of structural CADD drawings under the direction of the Structural Project Engineer. <br />6,7,8,9 <br />Yvonne MacAdmin <br />Will provide Structural Administration services, including general word processing, filing, etc.6,7,8 <br />REV: 11-07-23 SK <br />ATTY/AGR.2023.241/BKF Engineers (Price Tract Pump Station Design) (Page 55 of 68)
The URL can be used to link to this page
Your browser does not support the video tag.