My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2023-063039 STMMA Broadway Plaza
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc2023-063039 STMMA Broadway Plaza
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 3:51:51 PM
Creation date
12/19/2023 3:48:57 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Doc Num
2023-063039
Rec Date
11/29/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that complies with all federal, state, and local law and regulations. Disposal of accumulated <br />sediment or debris will not occur on the Property. <br />5. Annual Inspection and Report. Developerwill, on an annual basis, complete a <br />Treatment Measure Operation and Maintenance Inspection Report ("Annual Report"). The <br />Annual Report will include all completed Inspection and Maintenance Checklists for the <br />reporting period and will be submitted to City in order to verify that inspection and <br />maintenance of the applicable stormwater treatment measure(s) have been conducted <br />pursuant to this Agreement. Developer will submit the Annual Report no later than <br />December 31 of each year, under penalty of perjury, to Office of the City Engineer, 1017 <br />Middlefield Road, Redwood City, CA 94063, or another member of City staff as directed by <br />City. The Annual Report will include a record of the volume of all accumulated sediment <br />removed as a result of the treatment measure(s). Developerwill conduct a minimum of one <br />(1) annual inspection of the stormwater treatment measure(s) between August 1St and <br />October 1St each year. City may require more frequent inspections. The results of <br />inspections will be recorded on the Annual Inspection Report. <br />6. Necessafy Changes and Modifications. At its sole expense, Developer will <br />make changes or modifications to the stormwater treatment measure(s) as City reasonably <br />determines are necessary to ensure that the stormwater treatment measure(s) are properly <br />maintained and continue to operate as originally designed and approved. <br />7. Access to the Property_. Developer hereby grants permission to City; the San <br />Francisco Bay Regional Water Quality Control Board (the "Regional Board"); the San Mateo <br />County Mosquito Abatement District (the "Mosquito Abatement District"); and their authorized <br />agents and employees to enter the Property at reasonable times and in a reasonable manner <br />to inspect, assess or observe the stormwater treatment measure(s) in order to ensure that the <br />stormwater treatment measure(s) are being properly maintained and are continuing to perform <br />in a manner adequate to protect water quality and the public health and safety. This includes <br />the right to enter the Property whenever there is a reasonable basis to believe that a violation <br />of this Agreement, City Stormwater Regulations, or the NPDES Permit, and any amendments <br />or re -issuances of the NPDES Permit is occurring, has occurred or threatens to occur. The <br />above listed agencies may also enter the Property when necessary for abatement of a public <br />nuisance or correction of a violation of City Stormwater Regulations. City, the Regional Board, <br />or the Mosquito Abatement District will provide reasonable (as may be appropriate for the <br />particular circumstances) notice to Developer before entering the Property. <br />8. Failure to Maintain Treatment Measures. In the event Developer fails to <br />maintain the stormwater treatment measure(s) as shown on the approved Site Plan in good <br />working order acceptable to City and in accordance with the Inspection and Maintenance <br />Checklist, then subject to the notice and cure provisions set forth below, the City and its <br />authorized agents and employees with prior notice, may enter the Property and take <br />whatever steps it deems necessary and appropriate to return the stormwater treatment <br />measure(s) to good working order. Prior to taking any such corrective action, the City agrees <br />to notify the Developer in writing of the claimed deficiencies and the actions which must be <br />taken to cure such deficiencies. Upon notification of such deficiencies, the Developer shall <br />REV: 4-12-2023 SK <br />ATTY/AGR.2023.072/SI XX, LLC (Broadway Plaza STMMA) (Page 3 of 55) <br />
The URL can be used to link to this page
Your browser does not support the video tag.