My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 Raimi & Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Agmt24 Raimi & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2024 12:26:29 PM
Creation date
1/26/2024 12:25:40 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Raimi & Associates, Inc.
PROJECT NAME
RWC Life Project - Precise Plan, Environmental, Community Engagement, and Economic Analysis Consulting Services
RMP File Number
304
Date
1/12/2024
MO Ref
City Council approved on 1/8/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 12-20-23 VR <br />The final report will be the basis for the transportation chapter of the Precise Plan <br />EIR document, which will be prepared by David J. Powers (DJP). Hexagon will <br />respond to public comments on the Draft EIR to assist the environmental <br />consultant in the completion of the Final EIR. The scope assumes a budget of 16 <br />hours to respond to comments on the draft EIR. Extensive public comments that <br />require additional hours would be considered an additional service. <br />Task 8.5 Utility Impact Study <br />Schaaf & Wheeler will use City-provided previously developed computer hydraulic models <br />to perform utility system capacity analysis. S&W will determine development densities <br />associated with the Precise Plan net increase in utility system demands. The net increase <br />in demands will be applied to the computer models to determine system capacity <br />exceedance and areas of capacity constraints. We assume two land use alternatives (the <br />project and CEQA project alternative) will be studied as part of this work. Schaaf & <br />Wheeler will prepare one draft and one final Utility Impact Study related to the City’s water, <br />sewer, and storm utility infrastructure. The Study is intended to provide adequate <br />information to the CEQA team to inform the EIR document preparation. The Study does <br />not include a formal Water Supply Assessment, which will be prepared by others. <br />Task 8.6 Screencheck EIR <br />Once the City provides DJP&A with comments on the ADEIR, DJP&A will revise the <br />document and submit an electronic Screencheck EIR to the City for final review and <br />comment. <br />Task 8.7: Public Review Draft EIR <br />Once the City provides final comments on the Screencheck EIR, DJP&A will finalize the <br />EIR based on the City’s comments and provide up to ten hard copies of the Draft EIR for <br />public distribution and a PDF of the document for posting on the City’s website. DJP&A <br />will also prepare the Notice of Completion (NOC) and Notice of Availability (NOA), in <br />accordance with the CEQA and City of Redwood City requirements. <br />The NOC and NOA will include a brief description of the project, the project location, and <br />will state where copies of the Draft EIR are available for review. DJP&A will submit an <br />electronic draft of the NOC and NOA to the City for review and comment. DJP&A will <br />revise and finalize the NOC and NOA based on City comments. DJP&A will transmit the <br />NOC, NOA, and copies of the EIR to the State Clearinghouse on behalf of the City. This <br />scope of work assumes the City will handle all local notifications and postings of the NOC <br />and NOA (i.e., mailings, newspaper ad, and filing at County Clerk). <br />Task 8.8: Administrative Final EIR <br />Upon completion of the 45-day Draft EIR circulation period, DJP&A will prepare an <br />Administrative Draft Final EIR. The Final EIR will contain the following: <br />List of persons and agencies who commented on the Draft EIR; <br />Responses to comments on the Draft EIR; <br />Revisions to the EIR text, as necessary; and <br />Copies of letters received on the Draft EIR. <br />ATTY/AGR.2023.318/Raimi + Associates (Redwood Life Precise Plan) (Page 30 of 45)
The URL can be used to link to this page
Your browser does not support the video tag.