My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 Black & Veatch Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Under $106K
>
Agmt24 Black & Veatch Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2024 3:52:46 PM
Creation date
3/19/2024 3:52:28 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
services of a fleet decarbonization consultant
RMP File Number
304.5
Date
3/8/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 02-27-24 MI <br />“ ”EXHIBIT A <br />SCOPE OF SERVICES, FEE AND PROJECT SCHEDULE <br />SCOPE OF SERVICES <br />Consultant shall perform the scope of services described herein. <br />TASK 1: ASSESSMENT OF FLEET AND TRANSITION PATHWAYS <br />Develop the future state of the City’s ZEV fleet composition and utilization and <br />recommend pathways to comply with the CARB ACF regulations. <br />1.1 Identify vehicles that can be transitioned to ZEV <br />1.2 Identify underutilized/oversized vehicles for current applications <br />1.3 Conduct ACF Compliance Options Cost Benefit Analysis <br />1.4 Determine ZEV viable conversion alternatives <br />1.5 Recommend compliance pathways <br />1.6 Develop and present draft deliverable <br />Deliverable: Fleet and Transition Pathway Assessment <br />TASK 2: CONDUCT NEEDS ASSESSMENT AND GAP ANALYSIS <br />Determine the projected number and location profiles of ZEV stations that are required to <br />meet the energy usage and demand by vehicle category. <br />2.1 Define energy usage and demand by vehicle category <br />2.2 Identify projected number and location profile of ZEV stations <br />2.3 Develop estimated ZEV infrastructure cost <br />2.4 Develop and present draft deliverable <br />Deliverable: Needs Assessment and Gap Analysis <br />TASK 3: PERFORM CAPACITY REVIEW <br />Determine facility capacity to support increased electrical load demand from new electric <br />vehicles and understand the overall impact to electric reliability and resiliency. <br />3.1 Calculate facility capacity to support electrical load demand <br />3.2 Develop and present draft deliverable <br />Deliverable: Review of Existing Conditions and Trends <br />TASK 4: DEVELOPMENT OF FLEET DECARBONIZATION AND CARB COMPLIANCE <br />PLAN <br />Develop a comprehensive plan that enables the City to comply with CARB regulations <br />and begin decarbonization of the City fleet. Specifically, this plan will prepare the City <br />ATTY/AGR.2024.022/Black & Veatch Corporation (Fleet Decarbonization) (Page 11 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.