Laserfiche WebLink
REV: 06-06-24 VR <br />EXHIBIT “A” <br />SCOPE OF SERVICES AND FEE <br />The city is proposing to repair a section of the existing levee located approximately 350 <br />feet north of Bridge Parkway, south of Belmont Slough near the Redwood LIFE campus <br />in Redwood City, California (Exhibit 1). A roughly 50-foot-long section of the existing <br />levee experienced erosion and a breach was created through the levee. This levee is a <br />part of the San Fracisco Bay Trail system, and the breach has suspended the use of a <br />portion of the trail, requiring a detour. The distressed location coincides with a formerly <br />plugged corrugated metal pipe culvert. The plan is to remove the culvert and restore the <br />area of distress to its original configuration. The city requires geotechnical support during <br />the planning and construction of the repair. <br />SCOPE OF SERVICES <br />Provide as-needed geotechnical engineering support services, including: <br />•Attend virtual and site meetings to discuss repair solutions with the city and the <br />city’s selected contractor. <br />•Prepare estimated geotechnical parameters related to the repair solutions, <br />including, but not limited to, earthwork recommendations, minimum excavation <br />slope angle, subgrade stabilization, compaction requirements, and estimates of <br />post-construction settlement. <br />•Review submittals and RFIs as needed. <br />•Perform construction compaction testing and observation. <br />•Prepare a letter summarizing our recommendations and observed condition of <br />repair at the end of earthwork operations. <br />•Additional services requested by the city as necessary to support the emergency <br />nature of the repair work. This task requires prior City approval in writing before <br />any charges can be made. No payments will be made without prior City <br />authorization. <br />All work to be performed under the supervision of a licensed California Geotechnical <br />Engineer. <br />ATTY/AGR.2024.079/ENGEO (Emergency Levee Repair) (Page 11 of 14)