Laserfiche WebLink
Principal Project Manager (Glen M. Anderson, PE, PSAP)Senior Project Manager (Lawrence D. Johnson, PE)Associate Engineer (Logan N. Fox, PE)Assistant Engineer (Nasser M. Danishayer, EIT)TJCAA (Electrical)Kier + Wright (Survey)Telstar InstrumentsSubtronicTotal295.00$ 270.00$ 220.00$ 200.00$ Task 1Project Management 22 98 24 24 87.5 0.0 0.0 0 2568 40 75 1236 8 8 8 302 16 12 12 424 4 4 4 10 262 4 626 2.5 29Task 2Topographic Survey 0 4 4 0 0 108 0 0.0 1164 4 108 116Task 3Basis of Design Report 6 48 60 32 110 0 20 0 2764 32 40 20 70 10 1762 16 20 12 40 10 100Task 460% Plan Submittal 2 20 32 20 100 0 15 0 1892 20 32 20 100 15 189Task 590% Plan Submittal 2 20 32 20 75 0 15 0 1642 20 32 20 75 15 164Task 6100% Plan Submittal 2 16 20 12 60 0 13 0 1232 16 20 12 60 13 123Task 7Bid Support Services 2 14 18 0 17.5 0.0 5.0 0.0 572 4 4 7.5 5.0 232. Attend Pre Bid Meeting 2 2 43. Prepare Addenda 4 4 84. Prepare Conform Planset 4 8 10 22Task 8Construction Support Services 26 74 52 48 155 0 30 0 38510 10 10 10 10 502. Attend Preconstruction Meeting 4 4 83. Submittal Review (Assume 25 Submittals each with 1 resubmittal) 8 50 30 30 110 10 2384. RFI Review (Assume 10 RFIs) 8 10 8 8 45 10 89Task 9Record Drawings and Project Closeout 2 8 20 16 0 0 13 0 592 4 4 4 13 272. Record Drawing Preparation 4 16 12 32Total 64 302 262 172 605.0 107.5 110.0 0.0 1,622.5TJCAA K&W Telstar Subtronic 0Task APotholing 0 4 4 0 0 0 0 75 834 4 75 83Task BSeparate Bid Packages for SSPS 22 and 23 2 40 64 48 125 0 5 0 2842 20 48 32 90 19220 16 16 35 5 92Optional Task Subtotal 2 44 68 48 125 0 5 75 367.0Total Including All Optional Tasks 66 346 330 220 730 107.5 115 75 1,989.5Optional Tasks S&W Hours1. Additional Construction Support Services for Separate Bid Packages1. Potholing (Assumes two potholes per SSPS, 4 potholes total)1. Separate Bid Document Packages for SSPS 22 and 23 at 60%, 90%, and 100% Deliverables1. 60% PS&E1. Project Management, Coordination2. Site Visits (3 In Person Assumed)3. Review of Record Drawings, Operations, Controls, and other Existing Information4. Organize and attend virtual project meetings for Kickoff, BOD, 60% and 90% design review milestones5. Prepare Schedule and provide updates for each milestone deliverable6. Bi-weekly conference call check-ins1. Topographic Survey and Utility Investigaiton1. Draft Report2. Final ReportHourly Rates1. 90% PS&E1. 100% PS&E1. Response to Bidder Questions1. Site Visits (Up to 5 assumed)1. Punchlist WalkthroughREV: 05-08-24ATTY/AGR.2024.064/Schaaf & Wheeler (Agreement for Services for Design Services) (Page 19 of 20)