My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 Schaaf & Wheeler
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Agmt24 Schaaf & Wheeler
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2024 11:57:55 AM
Creation date
7/26/2024 11:57:20 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Schaaf & Wheeler
RMP File Number
304.5
Date
6/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Principal Project Manager (Glen M. Anderson, PE, PSAP)Senior Project Manager (Lawrence D. Johnson, PE)Associate Engineer (Logan N. Fox, PE)Assistant Engineer (Nasser M. Danishayer, EIT)TJCAA (Electrical)Kier + Wright (Survey)Telstar InstrumentsSubtronicTotal295.00$ 270.00$ 220.00$ 200.00$ Task 1Project Management 22 98 24 24 87.5 0.0 0.0 0 2568 40 75 1236 8 8 8 302 16 12 12 424 4 4 4 10 262 4 626 2.5 29Task 2Topographic Survey 0 4 4 0 0 108 0 0.0 1164 4 108 116Task 3Basis of Design Report 6 48 60 32 110 0 20 0 2764 32 40 20 70 10 1762 16 20 12 40 10 100Task 460% Plan Submittal 2 20 32 20 100 0 15 0 1892 20 32 20 100 15 189Task 590% Plan Submittal 2 20 32 20 75 0 15 0 1642 20 32 20 75 15 164Task 6100% Plan Submittal 2 16 20 12 60 0 13 0 1232 16 20 12 60 13 123Task 7Bid Support Services 2 14 18 0 17.5 0.0 5.0 0.0 572 4 4 7.5 5.0 232. Attend Pre Bid Meeting 2 2 43. Prepare Addenda 4 4 84. Prepare Conform Planset 4 8 10 22Task 8Construction Support Services 26 74 52 48 155 0 30 0 38510 10 10 10 10 502. Attend Preconstruction Meeting 4 4 83. Submittal Review (Assume 25 Submittals each with 1 resubmittal) 8 50 30 30 110 10 2384. RFI Review (Assume 10 RFIs) 8 10 8 8 45 10 89Task 9Record Drawings and Project Closeout 2 8 20 16 0 0 13 0 592 4 4 4 13 272. Record Drawing Preparation 4 16 12 32Total 64 302 262 172 605.0 107.5 110.0 0.0 1,622.5TJCAA K&W Telstar Subtronic 0Task APotholing 0 4 4 0 0 0 0 75 834 4 75 83Task BSeparate Bid Packages for SSPS 22 and 23 2 40 64 48 125 0 5 0 2842 20 48 32 90 19220 16 16 35 5 92Optional Task Subtotal 2 44 68 48 125 0 5 75 367.0Total Including All Optional Tasks 66 346 330 220 730 107.5 115 75 1,989.5Optional Tasks S&W Hours1. Additional Construction Support Services for Separate Bid Packages1. Potholing (Assumes two potholes per SSPS, 4 potholes total)1. Separate Bid Document Packages for SSPS 22 and 23 at 60%, 90%, and 100% Deliverables1. 60% PS&E1. Project Management, Coordination2. Site Visits (3 In Person Assumed)3. Review of Record Drawings, Operations, Controls, and other Existing Information4. Organize and attend virtual project meetings for Kickoff, BOD, 60% and 90% design review milestones5. Prepare Schedule and provide updates for each milestone deliverable6. Bi-weekly conference call check-ins1. Topographic Survey and Utility Investigaiton1. Draft Report2. Final ReportHourly Rates1. 90% PS&E1. 100% PS&E1. Response to Bidder Questions1. Site Visits (Up to 5 assumed)1. Punchlist WalkthroughREV: 05-08-24ATTY/AGR.2024.064/Schaaf & Wheeler (Agreement for Services for Design Services) (Page 19 of 20)
The URL can be used to link to this page
Your browser does not support the video tag.