My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC20-14 0125 PC Reso South Main Mixed Use Project Entitlement Signed
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2020
>
Reso PC20-14 0125 PC Reso South Main Mixed Use Project Entitlement Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:57:05 AM
Creation date
7/31/2024 9:56:52 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
10/27/2020
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:57 AM
Modified:
7/31/2024 9:57 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 9:57 AM
Modified:
7/31/2024 9:57 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTY/RESO.0125/PC RESO SOUTH MAIN MIXED USE PROJECT – ENTITLEMENT <br />REV: 10-27-2020 PR <br />Page 29 of 38 <br /> <br />design phase but must be completed prior to submittal of final design. Applicant shall contact the <br />Fire Department for fire flow requirements, and then submit a written fire flow test request to <br />Engineering. [COA][ENGINEERING] <br />43. C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal Regional <br />Permit (MRP) NPDES Permit CAS612008 and be in compliance with San Mateo County C.3 <br />Stormwater Technical Guidance. [SDR][ENGINEERING] <br />a. Treatment Controls – Treatment measures to be shown on final improvement or grading <br />plans shall not differ materially from the treatment measures presented on the project’s <br />Vesting Tentative Map, approved on [final action date], without written approval from <br />the Engineering Department. <br />b. Treatment Measure Inspection – Applicant shall coordinate installation of stormwater <br />treatment measures with the municipality, shall arrange to have the City’s designated <br />inspector present at the time of installation, and shall have the City’s designated inspector <br />complete a final inspection of installed stormwater treatment measure immediately after <br />installation is complete. <br />44. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that includes, at a <br />minimum, exhibit(s) showing drainage areas and location of Low Impact Development (LID) <br />treatment measures; total project site area and total area of land disturbed; total new and/or <br />replaced impervious area; treatment measures and hydraulic sizing calculations; a listing of source <br />control and site design measures to be implemented at the site; saturated hydraulic conductivity <br />rate(s) at relevant locations or hydrologic soil type (A, B, C or D) and source of information; elevation <br />of high seasonal groundwater table; and a brief summary of how the project is complying with <br />Provision C.3 of the MRP. [COA][ENGINEERING] <br />45. Construction General Permit – For construction activity resulting in a land disturbance of one acre <br />or more, applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board <br />under the Construction Activities Storm Water General Permit (General Permit). The NOI indicates <br />the applicant’s intent to comply with the San Mateo Countywide Stormwater Pollution Prevention <br />Program, including a Stormwater Pollution Prevention Plan (SWPPP). [SDR] [ENGINEERING] <br />46. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices (BMPs) <br />for construction shall be implemented to protect water quality, in accordance with the approved <br />Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available electronically for <br />inserting into project plans. [SDR][ENGINEERING] <br />Street Infrastructure Improvements <br />47. Streetlights - Traffic-scale (cobra-head) and pedestrian-scale (post-top) streetlights shall be <br />installed as shown on the Vesting Tentative Map. Additional streetlights shall be installed, if <br />needed, as determined by the City Engineer. The style and location of all streetlights shall be as <br />determined by the City Engineer and Planning Manager. [SDR][ENGINEERING] <br />48. Traffic Signal – Signalize the intersection at Main and Pine streets, including all associated <br />improvements, prior to issuance of the temporary certificate of occupancy for the final commercial <br />building. [MI-2] [ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.