Laserfiche WebLink
ATTY/RESO.0020/PC RESO GRANTING APPROVAL OF PERMITS FOR 150 CHARTER <br />REV: 04-29-2021 PR <br />Page 17 of 20 <br />c. Provide a key pad with 24 hour access code for public safety personnel at the main entrance, as opposed to just RFID readers or similar devices 65. Elevator Requirements – The following requirements for elevators apply: [SDR][BUILDING] a. One elevator shall be available for use as an accessible means of egress in case of emergency. b. One elevator shall be connected to backup generator power in order to remain operable during emergencies. This elevator shall be provided with appropriate signage and shall extend to all floors including the lower levels of the parking structure c. All additional elevators shall be connected to battery backup with sufficient power to bring the elevator to the exit level in the event of an emergency. d. All elevators shall be equipped with smoke curtains. Construction-Related Activities 66. Verification for Dimensions – All dimensions, including building location on the site, setbacks, building height, etc. shall be verified by a licensed surveyor. A survey report shall be provided to the Building Inspector for review and approval. [COA][BUILDING] 67. Sales and Use Taxes – Applicant shall use good faith efforts to register with the Board of Equalization to create an ID prior to project construction and operation. This maximizes the City’s allocation of sales and use taxes associated with project construction. Contact Nancy Murguia, Finance Department, at (650) 780-7097 or nmurguia@redwoodcity.org. [COA][FINANCE] 68. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere to the City’s Noise Ordinance. If possible, the noisiest construction activities would be scheduled for daytime hours when the ambient noise levels are highest. [SDR][BUILDING] 69. Construction Sign - Prior to the start of any construction work, including demolition, install at least one 36” x 48” (minimum) construction sign in a visible location along the project frontage for the duration of construction. The sign shall include, at minimum, the following information: project name & address, elevation or rendering, construction manager (name, phone number), anticipated completion (season, year), and the City’s permitting website http://permits.redwoodcity.org [COA][PLANNING] 70. Construction Meetings – The applicant is required to contact the Permit Counter (650.780.7350) to schedule the following meetings prior to or during construction. [COA][BUILDING] a. Pre-Submittal – Prior to building permit submittal, schedule a pre-submittal meeting with Building, Planning, Engineering and Fire staff to discuss the permitting process and submittal requirements. b. Pre-Construction - After City permits are issued, but prior to start of construction, schedule a pre-construction meeting with Engineering, Building, Fire, and Planning staff to discuss the inspection process and requirements for construction and site work. The applicant shall arrange for the attendance of the owner, developer, construction manager,