My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC21-10 0073 PC Reso 239 Vera Ave
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2021
>
Reso PC21-10 0073 PC Reso 239 Vera Ave
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 10:08:06 AM
Creation date
7/31/2024 10:08:01 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
9/21/2021
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:08 AM
Modified:
7/31/2024 10:08 AM
Text:
http://www.redwoodcity.org/home/showdocument?id=2002
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:08 AM
Modified:
7/31/2024 10:08 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH38WASYRE
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:08 AM
Modified:
7/31/2024 10:08 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVIPAIMFE
ID:
4
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:08 AM
Modified:
7/31/2024 10:08 AM
Text:
http://www.redwoodcity.org/home/showdocument?id=1952
ID:
5
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:08 AM
Modified:
7/31/2024 10:08 AM
Text:
http://www.redwoodcity.org/home/showdocument?id=1948
ID:
6
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:08 AM
Modified:
7/31/2024 10:08 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH30SU
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0073/PC RESO 239 VERA AVE <br />REV: 09-24-2021 VR <br />Page 9 of 16 <br /> <br />3. Water and Sewer Fees – Pay applicable water, recycled water, and wastewater- <br />related fees as outlined on the City’s website. [SDR][ENGINEERING] <br /> <br />4. Parks Impact Fee – Pay a Parks Impact Fee for the net new dwelling units <br />resulting from the project, estimated at $597,301.93 prior to final map approval for ownership <br />projects. [SDR][PARKS] <br /> <br />5. Affordable Housing Impact Fee – Pay an Affordable Housing Impact Fee, <br />estimated at $86,760[PLANNING] <br />Landscaping and Site Improvements <br /> <br />6. Stormwater Runoff - Post-construction runoff into the storm drain shall not <br />exceed pre-construction runoff levels. The applicant’s design professional shall evaluate the <br />project’s impact to the City’s storm drainage system and shall substantiate their conclusions with <br />drainage calculations to the satisfaction of the City Engineer. The project shall be designed in <br />conformance with the Drainage Guidelines for Residential or Commercial Development. [SDR] <br />[ENGINEERING] <br /> <br />7. Bicycle Parking – Provide for four short-term (visitor) and secure bicycle parking <br />and demonstrate this on the building permit plans. [COA][ENGINEERING] <br /> <br /> Final Map <br />1. Final Map - Obtain approval and record a Final Map prior to building permit <br />issuance. All final maps shall include the lot configuration and proposed easements and conform <br />to the Subdivision Map Act and Chapter 30 of the Municipal Code. [SDR][ENGINEERING] <br /> <br />2. Agreements - Prior to Final Map approval, enter into the following agreements in <br />a form acceptable to the City Attorney and the Community Development Director: <br />[COA][ENGINEERING] <br /> <br />a. A Landscape Maintenance Agreement for all assigned landscape areas <br />in public rights of way, easements, and/or on property in which the City holds an <br />interest to be maintained. Maintenance items shall include, but are not limited to, <br />planting trees, shrubs, flowers, grass and all appurtenances including irrigation <br />systems and pedestrian scale lighting. <br />b. A Stormwater Treatment Measures Maintenance Agreement for all on- <br />site stormwater treatment measures associated with the project. <br />c. An Improvement Agreement to guarantee the installation of all <br />improvements required of the project and to provide for payment of all City <br />inspection and plan check charges associated with the installation of public and <br />private improvements, including, but not limited to, streets, sanitary sewers, water, <br />storm drains and street lights. <br />d. CC&Rs including provisions for maintenance of and access to shared <br />utilities, stormwater treatment facilities, surface improvements, and common <br />areas, and an estimate of costs and proposed level of maintenance for each of the <br />activities identified. All property owners must be members. [COA][PLANNING]
The URL can be used to link to this page
Your browser does not support the video tag.