Laserfiche WebLink
ATTY/RESO.0086/PC RESO RECOMMENDING APPROVAL OF ZA AMENDMENT – 1616 GORDON STREET <br />REV: 10-13-2021 VR <br />Page 16 of 21 <br />b. Treatment Measure Inspection – Applicant shall coordinate installation of stormwater treatment measures with the municipality, shall arrange to have the City’s designated inspector present at the time of installation, and shall have the City’s designated inspector complete a final inspection of installed stormwater treatment measure immediately after installation is complete. 30. Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that includes, at a minimum, exhibit(s) showing drainage areas and location of Low Impact Development (LID) treatment measures; total project site area and total area of land disturbed; total new and/or replaced impervious area; treatment measures and hydraulic sizing calculations; a listing of source control and site design measures to be implemented at the site; saturated hydraulic conductivity rate(s) at relevant locations or hydrologic soil type (A, B, C or D) and source of information; elevation of high seasonal groundwater table; and a brief summary of how the project is complying with Provision C.3 of the MRP. [COA][ENGINEERING] 31. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices (BMPs) for construction shall be implemented to protect water quality, in accordance with the approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available electronically for inserting into project plans. [SDR][ENGINEERING] Street Infrastructure Improvements 32. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the satisfaction of the City Engineer at project completion. When this requires additional pavement restoration, the Engineer shall approve the preferred layout of pavement markings. [SDR][ENGINEERING] Construction-Related Activities 33. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere to the City’s Noise Ordinance. If possible, the noisiest construction activities would be scheduled for daytime hours when the ambient noise levels are highest. [SDR][BUILDING] 34. Construction Sign - Prior to the start of any construction work, including demolition, install at least one 36” x 48” (minimum) construction sign in a visible location along the project frontage for the duration of construction. The sign shall include, at minimum, the following information: project name & address, elevation or rendering, construction manager (name, phone number), anticipated completion (season, year), and the City’s permitting