My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC21-12 0099 PC Reso for 1417 Middlefield Rd
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2021
>
Reso PC21-12 0099 PC Reso for 1417 Middlefield Rd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 10:10:27 AM
Creation date
7/31/2024 10:10:22 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
11/16/2021
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:10 AM
Modified:
7/31/2024 10:10 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH24NORE_ARTIIEXUNNO_DIV3CO_S24.32TILI
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 10:10 AM
Modified:
7/31/2024 10:10 AM
Text:
http://permits.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0099/PC RESO FOR 1417 MIDDLEFIELD RD <br />REV: 11-12-2021 JB <br />Page 13 of 16 <br />30. Sump Pump – Prior to issuance of the Building Permit, the project plans shall show back up power and redundancy pump for the proposed sump pump system. Street Infrastructure Improvements 31. Project Plans – Prior to issuance of the Building Permit, the project plans shall be updated to accurately reflect the topographic information along the property frontage, including but not limited to the improvements installed by the Middlefield Road improvement project. 32. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the satisfaction of the City Engineer at project completion. When this requires additional pavement restoration, the Engineer shall approve the preferred layout of pavement markings. [SDR][ENGINEERING] Construction-Related Activities 33. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere to the City’s Noise Ordinance. If possible, the noisiest construction activities would be scheduled for daytime hours when the ambient noise levels are highest. [SDR][BUILDING] 34. Construction Sign - Prior to the start of any construction work, including demolition, install at least one 36” x 48” (minimum) construction sign in a visible location along the project frontage for the duration of construction. The sign shall include, at minimum, the following information: project name & address, elevation or rendering, construction manager (name, phone number), anticipated completion (season, year), and the City’s permitting website http://permits.redwoodcity.org [COA][PLANNING] 35. Pre-Construction Meeting - After City permits are approved, but prior to start of construction, hold a preconstruction conference with Engineering and Building staff and other interested parties. The developer shall arrange for the attendance of the construction manager, contractor, and all subcontractors who are responsible for grading and erosion and sedimentation protection controls. [COA][ENGINEERING] 36. Construction Management and Staging - Prior to encroachment permit issuance, submit a construction parking management plan, which shall outline the number of construction workers by phase, phase duration, where parking will be located for each phase. Construction parking, material storage, equipment, or other construction-related uses are not allowed within the City right of way without prior approval from the City Engineer. [COA][ENGINEERING] 37. Lane Closures - Traffic control for lane closures shall conform to the Work Area Traffic Control Handbook. Street closures require submission of traffic control plans and approval in advance. [SDR][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.