Laserfiche WebLink
Findings and Statements Required by the California Environmental Quality Act <br />Redwood City Transit District DTPP Amendments 31 ESA / 202100421.00 <br />Subsequent Environmental Impact Report October 2022 <br />11. Noise and Vibration <br />Impact NO-1: Implementation of the proposed Transit District DTPP Amendments would <br />not generate a substantial temporary increase in ambient noise levels in the vicinity of the <br />project in excess of standards established in the local general plan or noise ordinance, or <br />applicable standards of other agencies. <br />Mitigation Measures. SEIR Mitigation Measure NO-1 (FSEIR, pp. 11-20 to 11-21) will <br />be implemented for the Project as provided in the MMRP. <br />Findings Regarding Impact NO-1: Based on the FSEIR and the entire record before the <br />City, the Council finds that Mitigation Measure NO-1 would substantially lessen the <br />severity of Impact NO-1, such that this potential impact would be less than significant <br />because it will require conventional construction-period noise abatement measures as <br />conditions of approval for all future projects involving demolition and construction <br />activities. <br />Impact NO-2: Implementation of the proposed Transit District DTPP Amendments would <br />not generate a substantial permanent increase in ambient noise levels in the vicinity of the <br />project in excess of standards established in the local general plan or noise ordinance, or <br />applicable standards of other agencies. <br />Mitigation Measures. SEIR Mitigation Measure NO-2 (FSEIR, p. 11-22) will be <br />implemented for the Project as provided in the MMRP. <br />Findings Regarding Impact NO-2: Based on the FSEIR and the entire record before the <br />City, the Council finds that Mitigation Measure NO-2 would substantially lessen the <br />severity of Impact NO-2, such that this potential impact would be less than significant <br />because an acoustical study shall be prepared by a qualified acoustical engineer during <br />final building design to evaluate the potential noise generated by building mechanical <br />equipment and to identify the necessary design measures to be incorporated to meet the <br />performance standards of Chapters 36.7.B of the City’s Redwood City Zoning Code. <br />Impact NO-3: Implementation of the proposed Transit District DTPP Amendments would <br />not generate excessive groundborne vibration or groundborne noise levels. <br />Mitigation Measures. SEIR Mitigation Measure NO-3 (FSEIR, p. 11-25) will be <br />implemented for the Project as provided in the MMRP. <br />Findings Regarding Impact NO-3: Based on the FSEIR and the entire record before the <br />City, the Council finds that Mitigation Measure NO-3 would substantially lessen the <br />severity of Impact NO-3, such that this potential impact would be less than significant. <br />Mitigation Measure NO-3 would impose conditions of approval that require the Project <br />Applicant to ensure that ground-borne vibration abatement measures are implemented by <br />the construction contractor to reduce ground-borne vibration levels generated by future <br />site-specific demolition and construction activities. Those conditions will: restrict the <br />hours in which vibration-generating activity is permitted; require written notice of