My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC22-06 0079 PC Reso Recommending Certification of the SEIR
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2022
>
Reso PC22-06 0079 PC Reso Recommending Certification of the SEIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:31:33 AM
Creation date
7/31/2024 11:31:03 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
10/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Mitigation Monitoring and Reporting Program <br /> <br />TABLE 4-1 (CONTINUED) <br />TRANSIT DISTRICT DTPP AMENDMENTS MITIGATION MONITORING AND REPORTING PROGRAM <br />Redwood City Transit District DTPP Amendments 4-6 ESA / 202100421.00 <br />Final EIR October 2022 <br />MITIGATION MEASURES <br />Monitoring Program <br />Implementation <br />Responsibility <br />Monitoring and <br />Reporting Action <br />Monitoring <br />Responsibility <br />Monitoring <br />Schedule <br />Noise <br />Mitigation Measure NO-1: Construction Noise Reduction (formerly Mitigation <br />Measure 11-4 from the DTPP Final EIR with clarifying amendments): The City <br />shall require Project Applicants to reduce demolition and construction noise impacts <br />on adjacent uses by imposing conditions of approval on all future projects involving <br />demolition and construction activities. These conditions shall require the Project <br />Applicant to undertake the following conventional construction-period noise <br />abatement measures: <br /> Construction Plan. Prepare a detailed construction plan identifying the schedule <br />for major noise-generating construction activities. The construction plan shall <br />identify a procedure for coordination with nearby noise-sensitive facilities so that <br />construction activities and the event schedule can be scheduled to minimize <br />noise disturbance. This plan shall be provided to all noise-sensitive land uses <br />within 500 feet of the construction site. <br /> Construction Scheduling. Ensure that noise-generating construction activity is <br />limited to between the hours of 7:00 AM to 8:00 PM Monday through Friday <br />except when authorized by the Building Official (Redwood City Municipal Code <br />Section 24.32). <br /> Construction Equipment Mufflers and Maintenance. Equip all internal combustion <br />engine-driven equipment with intake and exhaust mufflers that are in good <br />condition and appropriate for the equipment. <br /> Equipment Locations. Locate stationary noise-generating equipment required on <br />construction project sites as far as possible from sensitive receptors when <br />sensitive receptors adjoin or are near a construction project site. <br /> Construction Traffic. Route all construction traffic to and from the construction <br />sites via designated truck routes to the maximum extent feasible. Prohibit <br />construction-related heavy truck traffic in residential areas where feasible. <br /> Quiet Equipment Selection. Use quiet construction equipment, particularly air <br />compressors, wherever feasible. <br /> Temporary Barriers. Construct solid plywood fences around construction sites <br />adjacent to residences, operational businesses, or noise-sensitive land uses. <br /> Temporary Noise Blankets. Temporary noise control blanket barriers shall be <br />erected along building facades of construction sites to attenuate noise from <br />elevated activities if noise conflicts cannot be resolved by scheduling. (Noise <br />control blanket barriers can be rented and quickly erected.) <br />Project Applicant, <br />City <br />1. Prepare and <br />implement <br />construction plan <br />and noise <br />abatement <br />measures <br />City 1. Prepare <br />construction plan <br />prior to issuance <br />of building permit <br />2. Implement <br />construction plan <br />and noise <br />abatement <br />measures during <br />construction
The URL can be used to link to this page
Your browser does not support the video tag.