Laserfiche WebLink
Findings and Statements Required by the California Environmental Quality Act <br />Harbor View Project PAGE 35 OF 48 ESA / 170951 <br />Final Environmental Impact Report October 2022 <br />ATTY/RESO.0085/PC RESO RECOMMENDING CEQA – EXHIBIT A <br />REV: 11-02-2022 VR <br />Impact TRANS-29: Under Cumulative Plus Project Conditions, the Project would result in the <br />addition of traffic volumes representing more than five percent of the ramp's capacity to the <br />northbound US 101 Off-Ramp to Woodside Road and southbound US 101 On-Ramp from <br />Woodside Road, which already exceed the ramp capacity in the AM and PM peak hours, <br />respectively under Cumulative Plus Project Conditions. <br />C. Project Alternatives Descriptions <br />The following seven Project alternatives, three of which are No Project development <br />scenarios, were considered in the environmental review process: <br />No Project – Existing General Plan (Light Industrial / Building Materials Use) <br />Alternative. This “No Project – Existing General Plan” Alternative reflects development that could <br />likely occur on the Project site through the natural course of growth under the existing Light <br />Industrial (LI) General Plan land use designation and development standards. The LI land use <br />designation allows low-intensity industrial and building materials uses that are the same as the land <br />uses that would continue to exist immediately north of the Project site and that previously existed <br />on areas of the Project site. <br />This alternative assumes development of approximately 884,810 square feet of low- <br />intensity industrial and building materials uses based on the maximum floor area ratio (FAR) of <br />0.75 allowed in the LI land use designation that applies to most (94 percent) of the 27.08-acre <br />Project site.3 Also based on the maximum FAR, development of this alternative would include one <br />to three low-rise three-story industrial or building materials buildings. Also, this alternative <br />assumes no parking structures would be developed; surface parking would be provided throughout <br />the site. <br />No Project – Existing Zoning (70/30 Research & Development [R&D] Lab + Ancillary <br />R&D Office) Alternative. This “No Project – Existing Zoning” Alternative reflects development <br />that could likely occur on the Project site through the natural course of growth under the existing <br />Industrial – Restricted (IR) zoning designation, to the extent that the growth is within what is <br />currently permitted by the General Plan. The majority of the Project site is within the IR zoning <br />designation, which is the basis for this alternative.4 <br />This alternative assumes the development of two buildings totaling 578,076 square feet of <br />R&D / Laboratory use (70 percent) and 247,747 square feet of ancillary R&D Office use (30 <br />percent), for a total building area of 825,823 square feet on the Project site, based on land uses and <br /> 3 27.08 acres equals 1,179,605 square feet of site area, multiplied by a 0.75 FAR totals 884,704 square feet of <br />building area. <br />4 The IR zone applies to 94 percent of the 27.08-acre Project site and to adjacent areas west and north of the Project site. <br />The General Industrial (GI) zone applies to the remaining 6 percent of the Project site — the northeast most corner.