My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC22-08 0085 PC Reso Recommending CEQA
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2022
>
Reso PC22-08 0085 PC Reso Recommending CEQA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:34:07 AM
Creation date
7/31/2024 11:33:44 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
11/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Findings and Statements Required by the California Environmental Quality Act <br />Harbor View Project PAGE 41 OF 48 ESA / 170951 <br />Final Environmental Impact Report October 2022 <br />ATTY/RESO.0085/PC RESO RECOMMENDING CEQA – EXHIBIT A <br />REV: 11-02-2022 VR <br />Explanation. Under the “Reduced Building and Building Height” Alternative, impacts <br />related to the intensity of development would be the same as those identified with the <br />Revised Project. The regular Office use floor area, service population, and vehicle trip <br />generation are the same for both scenarios. Therefore, impacts regarding traffic, air quality, <br />greenhouse gas emissions, noise, service population, and demand for public services and <br />utilities would be the same as those of the Revised Project. <br />The conservatively significant cumulative air quality impact identified for the Revised <br />Project (Impact AIR-1.CU) (exceeding growth assumptions of the 2017 Clean Air Plan) <br />would continue to occur with the “Reduced Building and Building Height” Alternative <br />since the Office land use program is the same for both scenarios. Similarly, all <br />transportation impacts of the Revised Project would continue to occur under this <br />alternative. <br />This alternative would construct six structures rather than four proposed with the Revised <br />Project. Moreover, each of the buildings under the “Reduced Building and Building <br />Height” Alternative would be lower in height than with the Revised Project, which would <br />therefore reduce the severity of impacts regarding construction activities (air quality and <br />noise) and aesthetics (shadow and light/glare). <br />The only other difference between this alternative and the Revised Project is the proposed <br />amenities building, which would be 23,000 square feet under the alternative and 35,000 <br />square feet with the Project, however this difference does not affect the floor area that <br />drives trip generation; both this alternative and the Revised Project involve the same land <br />uses. As such, this alternative would equally meet each of the objectives of the Revised <br />Project; as the “Reduced Building and Building Height” Alternative was slightly modified <br />to create the Revised Project, it would maintain the overall internal site orientation and <br />clustered development, as well as the provision of recreation or open space amenities, <br />bicycle/pedestrian connections onsite and to Downtown <br />70/30 Office + Ancillary R&D Lab Alternative <br />Findings. The “70/30 Office + Ancillary R&D Lab” Alternative is described and discussed <br />on pages 5-25 to 5-29 in the DEIR and is summarized relative to the Revised Project in <br />Table 5-2 of the FEIR. All characteristics of this alternative are greater than the Revised <br />Project. So, all of the environmental impacts of the alternative would be more intense than <br />identified for the Revised Project. Therefore, the “70/30 Office + Ancillary R&D Lab” <br />Alternative is hereby rejected from further consideration because it would not reduce or <br />avoid any of the significant effects of the Revised Project, nor would it meet most of the <br />Revised Project’s objectives. <br />Explanation. The regular Office use and amenities building program under the “70/30 <br />Office + Ancillary R&D Lab” Alternative is largely the same as for the Revised Project. It <br />is the introduction of the R&D Lab use that substantially increases the total floor area, <br />service population, and building development compared to the Revised Project. Taken <br />together, the overall intensity and development of the “70/30 Office + Ancillary R&D Lab”
The URL can be used to link to this page
Your browser does not support the video tag.