Laserfiche WebLink
ATTY/RESO.0083/PC RESO RECOMMENDING GENERAL PLAN AMENDMENT APPROVAL – HARBOR VIEW PROJECT – EXHIBIT D <br />REV: 11-02-2022 VR <br />Page 6 of 16 <br />Utility Infrastructure Improvements 30. Conformance with the City’s Engineering Standards – All public improvements shall be <br />designed and constructed in accordance with the City’s Engineering Standards. <br />[SDR][ENGINEERING] 31. Encroachment Permits – The applicant shall obtain an Encroachment Permit from the <br />Engineering and Transportation Division for work listed below. This permit shall be obtained <br />prior to the commencement of construction of the road, utilities, or any site improvements. <br />[SDR][ENGINEERING] a. Work in the City public right-of-way, easements or property in which the City holds an <br />interest. b. Work requiring a grading permit. Grading permits require a Plot and Finished Grading <br />Plan prepared by a California-registered Civil Engineer. c. Work requiring on-site shoring which affects the public right of way d. Work using the public right-of-way for any fixed structure (awnings, roof overhangs, <br />fixed planters, etc.). Insurance, meeting the City’s standards, is required. This permit <br />will be recorded against the property. <br /> 32. Undergrounding Utilities - The applicant shall underground all overhead utilities along <br /><name street or frontage>, which shall be shown on the building permit plans. <br />[SDR][ENGINEERING] 33. Sewer Capacity – Prior to encroachment permit issuance, the applicant shall submit to the <br />City, and obtain approval of, an evaluation and report prepared by a licensed engineer <br />demonstrating that the existing sewer mains have sufficient capacity for the project. The <br />study shall consider existing, project, other approved projects, and applications currently <br />under review in determining the needed capacity. If the existing sewer main is less than 6” <br />in size, or is in any other way not sufficient as determined by the City Engineer, applicant <br />shall, as part of the Project, construct and install new sewer mains sufficient to meet such <br />requirements, in accordance with the City's Engineering standards and as directed by the <br />City Engineer to the City Engineer's satisfaction. [SDR][ENGINEERING] 34. Sewer Lateral Limit – The project is limited to one sewer lateral per parcel. <br />[COA][ENGINEERING]Sewer Lateral Size for Commercial Development - All sewer laterals <br />less than 4” shall be upgraded to a minimum 6” size. [SDR] [ENGINEERING] 35. Water Mains – Prior to issuance of the first certificate of occupancy for the project, the <br />applicant shall construct the 20” water main on Blomquist Street from Maple Street to <br />Seaport Boulevard, approximately 1,500 linear feet, in accordance with all applicable City <br />of Redwood City Engineering Standards, to the satisfaction of the City. [SDR][ENGINEERING