Laserfiche WebLink
ATTY/RESO.0108/PC RESO RECOMMENDING APPROVAL OF DTPP 1330 ECR <br />REV: 01-11-23 JB <br />Page 14 of 23 <br />including a reasonable utility allowance (as defined in Health & Safety Code Section 50053); and ii. Four (4) studio units and two (2) one-bedroom units to low income households (as defined in Health & Safety Code Section 50079.5) which shall in no event exceed 80 percent of area median income, adjusted for family size at an “affordable rent” including a reasonable utility allowance (as defined in Health & Safety Code Section 50053). iii. Six (6) studio units and one (1) two-bedroom units to very low income households (as defined in Health & Safety Code Section 50105) which shall in no event exceed 50 percent of area median income, adjusted for family size at an “affordable rent” including a reasonable utility allowance (as defined in Health & Safety Code Section 50053). The Affordable Housing Agreement term shall be for a period of 55 years from the date of final certificate of occupancy. The affordable housing agreement shall specify the number, type, location, size, and phasing of all affordable units, provisions for marketing, income certification and screening of potential renters of units including the financing of ongoing administrative and monitoring costs, consistent with the approved affordable housing plan. Reports and Surveys 24. Geotechnical Report - Include a geotechnical field review and reports for all grading work, prepared by a licensed geotechnical engineer and in conformance with Engineering Standards, Volumes II & III, CBC, and other State regulations. This shall be submitted as part of the building permit application. [SDR][ENGINEERING] 25. As-Builts – Provide “as-built” or “record” drawings, to be submitted in paper, PDF and AutoCAD formats prior to project sign-off. [COA][ENGINEERING] 26. Transportation Demand Management Program – A final Transportation Demand Management (TDM) program, describing the elements to be implemented, shall be reviewed and approved by the City’s Engineering staff prior to certificate of building occupancy. The TDM program shall include an annual reporting requirement for the first three years that details daytime parking utilization rates and employee use and awareness of the program. Annual reporting shall begin on December 1 of each year. [COA][ENGINEERING] <br /> <br /> 27. Recycled Water Report - The applicant shall enter into a Recycled Water Use Agreement and shall hire an engineer licensed in California and experienced in the field of wastewater treatment to prepare a recycled water report for dual plumbed facilities, pursuant to California Water Code section 13522.5 and in accordance with California