My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC22-13 0108 PC Reso Recommending Approval of DTPP 1330 ECR
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2022
>
Reso PC22-13 0108 PC Reso Recommending Approval of DTPP 1330 ECR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:39:17 AM
Creation date
7/31/2024 11:39:08 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
12/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0108/PC RESO RECOMMENDING APPROVAL OF DTPP 1330 ECR <br />REV: 01-11-23 JB <br />Page 22 of 23 <br />[COA][BUILDING] d. Construction Noise and Vibration (Mitigations 11-3 and 11-4) – Construction activities shall minimize the impacts of noise and vibration on adjacent properties. More requirements and details of these mitigation measures are found in Mitigation 11-3 and 11-4 of the DTPP EIR. [COA][ENGINEERING] e. Air Quality Report (Mitigation 12-1) – The applicant shall provide an air quality report to analyze the potential health risks and incorporate appropriate design and construction features that reduce potential exposure of persons to pollutants in accordance with BAAQMD adopted standards for control of odor/toxics for sensitive receptors. More requirements and details of this mitigation measure are found in Mitigation 12-1 of the DTPP EIR. [COA][BUILDING] f. Wildlife Movement and Impacts (Mitigation 15-3) – The applicant shall hire a qualified biologist to conduct a survey for nesting birds prior to tree removal or trimming, and submit the survey for filing. All tree removal and trimming shall take place outside of the breeding season. [COA][PLANNING] g. Tree Removal (Mitigation 15-4) - Any project in the DPP area that would involve the removal of any tree shall complete the application and review process specified in the City's Tree Preservation Ordinance (Municipal Code chapter 35) prior to project approval. Implementation of this measure would ensure protection of heritage trees, as well as planting of replacement trees in cases that trees are removed. [COA][PLANNING] h. Geotechnical Reports (Mitigation 16-1) - The detailed, design-level geotechnical investigations required by the City Building Official shall include analysis of expansive soil hazards and recommend stabilization measures. Once grading plans have been developed, the actual use of expansive soils in engineered fill construction shall be further evaluated and the location of primary borrow source areas for fills shall be determined. Additionally, supplemental field and laboratory testing of potential cut materials shall be completed. In addition to observing all cut and fill slope construction, the project geotechnical engineer shall inspect and certify that any expansive soils underlying individual building pads and all roadway subgrades have been either removed or amended in accordance with City-approved construction specifications. [COA][BUILDING] i. Erosion Control (Mitigation 16-3) - Future development projects in the DPP area involving a grading area of 10,000 or more square feet to prepare erosion control plans subject to City approval and consistent with the required project Stormwater Pollution Prevention Plans (SWPPPs) as well as Best Management Practices (BMPs) specified by the Redwood City Stormwater Management and Discharge Control Program (Municipal Code Chapter 27A). [COA][ENGINEERING] 35. Notice of Right to Operations – Provide a “Notice of Right to Downtown Operations” to all tenants prior to execution of any lease per DTPP Section 2.2.5. [SDR][PLANNING]
The URL can be used to link to this page
Your browser does not support the video tag.