My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC22-14 0114 PC Reso Certifying Final EIR 557 E. Bayshore Road
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2022
>
Reso PC22-14 0114 PC Reso Certifying Final EIR 557 E. Bayshore Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:40:13 AM
Creation date
7/31/2024 11:39:55 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
12/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0114/PC RESO CERTIFYING FINAL EIR – 557 E. BAYSHORE ROAD <br />REV: 12-09-22 VR <br />Page 17 of 61 <br />wildfire impacts. <br />21. Growth-Inducing Impacts. These findings regarding the Project’s potential growth- <br />inducing impacts are based on the analysis on page 210 of the DEIR, which is hereby <br />incorporated in its entirety. <br />Impact GRO-1: The Project would not foster or stimulate significant economic or <br />population growth in the surrounding environment. <br />B. Findings Regarding Potentially Significant Impacts. <br />The following potential environmental impacts of the 557 East Bayshore Road <br />Project were determined to be potentially significant and to require mitigation measures to <br />avoid their effects or to reduce their severity, as set forth in Chapter 3 of the DEIR, as <br />incorporated into the EIR. The Planning Commission concurs with the conclusions in the <br />DEIR, as incorporated into the EIR, and makes the following findings with respect to such <br />potentially significant impacts. <br />1. Air Quality Impact AIR-2: The project could result in a cumulatively considerable net <br />increase of any criteria pollutant for which the project region is non-attainment under an <br />applicable federal or state ambient air quality standard. <br /> <br />Mitigation Measures. EIR Mitigation Measures AIR-2.1 & AIR-2.2 will be <br />implemented for the Project as provided in the MMRP. <br />Findings Regarding Impact AIR-2. The Planning Commission finds that <br />incorporating the requirements of Mitigation Measures AIR-2.1 & AIR-2.2 into the Project <br />would substantially lessen the severity of Impact AIR-2, such that this impact would be <br />less than significant, because Mitigation Measures AIR-2.1 and AIR-2.2 requires all <br />construction activities to occur in compliance with the Bay Area Air Quality District’s best <br />management practices, which the District has determined reduce the health risks associated <br />with fugitive dust from construction activities to acceptable levels. The measures also <br />require certain construction equipment to meet U.S. EPA Tier 4 emission standards for <br />PM. This finding is based on the entire record of proceedings for the Project, including but <br />not limited to the discussion and analysis set forth on pages through 32-46 of the DEIR, <br />which includes a full statement of the impact and applicable mitigation measures and is <br />hereby incorporated herein in its entirety. <br />2. Air Quality Impact AIR-3: The Project could expose sensitive receptors to substantial <br />pollutant concentrations. <br /> <br />Mitigation Measures. EIR Mitigation Measures AIR-2.1 & AIR-2.2 will be implemented <br />for the Project as provided in the MMRP. <br /> <br />Findings Regarding Impact AIR-3. The Planning Commission finds that incorporating <br />the requirements of Mitigation Measures AIR -2.1 & AIR-2.2 into the Project would <br />substantially lessen the severity of Impact AIR-2, such that this impact would be less than <br />significant, because Mitigation Measures AIR -2.1 and AIR-2.2 requires all construction <br />activities to occur in compliance with the Bay Area Air Quality District’s best management
The URL can be used to link to this page
Your browser does not support the video tag.